Titum, I can tell you one thing for sure and that is that those huge piles outside the main compound are NOT tailings from this mill. There is only one possibility of any tailings from this mill and that is several little dumps in a pile near the fence beside where the small tandem articulating ore truck is parked. Looks like perhaps somewhere between 125 and 150 tons in that pile. Also If these pics were shot on Sunday, I wonder why the mill was not in operation at that time, it would appear that it was shut down for the entire weekend as you can see the loader buckets facing down to prevent rainwater accumulation and rust.I can not say that any mill that was processing high gold ore would ever shut down on weekends if they were in fact even in operation to begin with. It is all in the pics, just take a close look at the piles outside the fence and you can tell that that stuff has never been through a mill, you can even see rocks in it. Maybe they are big gold nuggets Ha Ha Maybe someday they will let us know the facts about processed tonnage and ore values, but it sure won't be until they have some numbers that can be published.JMHO
Paid