Re: Don post# 12186

Friday, 08/29/2008 10:30:35 AM

Friday, August 29, 2008 10:30:35 AM

Post# of 16569
The flow lines are 8 miles long. you are right it takes time. I was told by someone ho does this work that you could figure approx. a week for a crew to complete 1 mile with steel pipe and digging through soil with some rock and hopefully not hitting any buried bolders. This is digging trench, connecting the steel pipe, back filling, inspections and blowing out of pipes. Using what I was told thats 8 weeks to install pipe then digging disposal wells.

You are right there is a shortage of pipe also.

Throw in rain you can add maybe two weeks. My hope is there are two crews working on this!