POE thoughts:
The next 3 wells will be extremely interesting. L44H-D2 is quite close to the monster well L44H-D1, which flows 3940 bpd.
The new side track wells have horizontal drilling. Note that NS8-D1 was flowing at 1480 bpd already. Now they are planning to add another 200 meter horizontal section to it! I don't see POE will go for anything below 3000 bpd for all the trouble. Must be something big!
Buy cheap, undiscovered stocks!
Disclosure: I usually own the stocks I post the most. The more I discuss, the more shares I own. Do you own DD before placing the trades.
Please post stock symbols first in all your posts.