from 1/07 JOIDES minutes

http://joiserver.joiscience.org/sodv/downloads/monthly_status_rpt/SODV%20Monthly%20Report_Jan_07.pdf

1.2.2.6 LDEO Science Support
Design work continued on the three main areas of the logging systems (logging
equipment, lab and IT). Schlumberger has continued efforts with Deep Down in
designing the new wireline heave compensation system for the SODV and the
following tasks have been completed:
1) Deep Down has ordered the long lead components.
2) Re-worked compensator plans were submitted to SLB and approved (the
original design was modified slightly to allow using the same
configuration onboard the Chikyu)
3) LDEO and SLB had a meeting in January 9-11 where the designs were
reviewed and approved.
4) Deep Down has hired 3 new staff members to work on the project.