Tuesday, May 07, 2024 11:59:39 AM
First, make the wet tailings dry, through the liquid press. Then the excavator and loader can deposit the dry stack from the ramp that was created to a huge ten foot high dumpster to be removed by the big truck transport. AND here is the good part. Use the dry stack tailings, bag it up , and sell it as underlayment for road development. Use the dry stack crushed rock, dirt, and other mineral , lay is down under the next stage asphalt, run a steam roller, and create a bona fide road, maybe from Amparo/Etzatlan dirt road back to the main paved road. And since there are 4 million tons of this material, bag it up, sell it to road biuilding companies. Create a new corporation , a subsidiary of AABB, and make money in disposing of the dry stack tailings. Underlayment under the asphalt road build up. = $$$$, not costs.
Last Shot Hydration Drink Announced as Official Sponsor of Red River Athletic Conference • EQLB • Jun 20, 2024 2:38 PM
ATWEC Announces Major Acquisition and Lays Out Strategic Growth Plans • ATWT • Jun 20, 2024 7:09 AM
North Bay Resources Announces Composite Assays of 0.53 and 0.44 Troy Ounces per Ton Gold in Trenches B + C at Fran Gold, British Columbia • NBRI • Jun 18, 2024 9:18 AM
VAYK Assembling New Management Team for $64 Billion Domestic Market • VAYK • Jun 18, 2024 9:00 AM
Fifty 1 Labs, Inc Announces Acquisition of Drago Knives, LLC • CAFI • Jun 18, 2024 8:45 AM
Hydromer Announces Attainment of ISO 13485 Certification • HYDI • Jun 17, 2024 9:22 AM