InvestorsHub Logo
Followers 99
Posts 17735
Boards Moderated 3
Alias Born 04/22/2010

Re: None

Friday, 04/26/2024 9:43:22 AM

Friday, April 26, 2024 9:43:22 AM

Post# of 189457
Spekkie said, When I asked whether the products were ready and if any issues were outstanding, he clearly said that everything was ready (stability, scaling etc) and the time line was fully intact and there were no changes to that. Tier 1’s are very interested and the number of them significantly increased after OFC demo’s.

https://investorshub.advfn.com/boards/read_msg.aspx?message_id=174302051

Exactly!! meanwhile Longs are being throttled here, I can't post much while Shorts and FAKE Longs mudsling at me and other Longs here NONSTOP!!!

Fact is LWLG has multiple products already, they have multiple versions of it's Perk Polymer, the latest being Perk 6, now available for Licensing, in addition they have a 200Gb modulator that is now capable of being produced at several large Foundries on 200mm Wafers including the Poling being performed at Wafer scale something Shorts said was impossible, Lebby has told investors that Customers could use these modulators in quantities of 4 per Transceiver device to produce an 800Gbs Transceiver currently, but the preference of the large Transceiver companies (Cisco etc) would be to use the single chip modulator array (4x200) which is still under construction but Lebby announced publicly at PECC that it would be ready sometime in 2024, but the individual modulators would be used in Sampling now while the single chip modulator array (4x200) would be used in mass commercialization, Lebby is still on track with his Timeline of Customer Acceptance and Ramp in 2024 and has not backed down on his SAM/SOM guidance, Shorts are the LYING SCAMMERS period!!

Remember that it is because of the following two main reasons that Tier 1 interest has skyrocketed in recent months

1) the early 2024 "Big Milestone" achieved of success in Mass Production of LWLG modulators on large Foundries 200mm Wafers

2) the INCREDIBLE reliability/stability data collected/presented at ECOC 2023 and then even more so at OFC in March 2024

Investors have learned INCREDIBLE Developments in 2024 so far!!! here is a summary of things investors have learned form OFC in March 2024, and Lebby's LD Micro Interview in April, as well as Lebby's Belgium visit/presentations in April

1) Lebby has LWLG modulators being implemented at SEVERAL large Foundries on 200mm Wafers now beginning in early 2024!! Lebby declared it a "BIG MILESTONE"!!!
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=174278606

2) Lebby has achieved Volume Scale Poling on 200mm Wafers!!! (successfully able to Pole Thousands of Devices at a time!!)

3) Lebby's LWLG team of seven completed demonstrations at OFC to over 20 potential Customers!! NDA's now estimated at 40 companies

4) the response to the OFC demos has been so overwhelming that Lebby claims the Tier 1's "being PULLED along" has become more like "being dragged along" (a good problem to have!!!)

Spekkie posted this
, Important take away we are working with multiple tier ones, tripled since a few weeks after OFC , wow we are golden

5) The Customer Funnel slide is updated and now showing greater than 20 Prospects and greater than 10 Leads, where in the ASM presentation it was only greater than 12 Prospects and 5 Leads, so about DOUBLED since the ASM!!!!

6) at OFC Google had a shout out to (LWLG) EOP on their slide for hetero integration.
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=174276893

7) KCC reported "the transceiver partner is a giant company that is dedicating a lot of their own resources to LWLG’s development."
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=174279401

8) Lebby also showcased that LWLG's Perk 6 is NOW ready and available for Licensing !!!

9) Lebby reported that 3rd party ETH Zurich set world record performance with LWLG Polymers running at 400Gbs per lane enabling 4 lane 1600gbs!!! This ensures LWLG ALREADY capable to meet the future Roadmap

10) The response from the Tier 1's is so overwhelming such that Lebby is 100% focused on SEVERAL Tier 1's who are battling it out for Lebby/LWLG's time and attention to bring 4x200 powered Transceivers to market ASAP!!

Folks this is a Cinderella story 40 years in the making!!!

For OVER 40 YEARS the Industry has tried UNSUCCESSFULLY!!

IBM, Intel, Boeing, Lockheed Martin, DuPont, AT&T Bell Labs, Honeywell, Motorola, GE, HP, 3M, and others in addition to numerous Universities and U.S. Government Agencies, DARPA, DOD, etc have all attempted to produce high-performance, high-stability electro-optic polymers

The Industry combined has spent literally in the Billions R&D $$ UNSUCCESSFULLY trying to do what LWLG has done!


LWLG's technology has been successfully developed in much less time than what the Industry spent, and at a cost less than 5% of what the Industry spent screwing around with unstable fragile molecules for 40 years!

RIDDLE ME THIS >> WHY WOULD THE INDUSTRY SPEND BILLIONS AND BILLIONS OF $$ ON SOMETHING THEY DIDN'T DESPERATELY WANT???????
Bullish
Bullish
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LWLG News