InvestorsHub Logo
Followers 436
Posts 18580
Boards Moderated 0
Alias Born 09/10/2000

Re: None

Sunday, 10/08/2023 12:29:24 PM

Sunday, October 08, 2023 12:29:24 PM

Post# of 3339
The Titan 1 project is centered over a sparsely vegetated, expansive flat lying ‘playa’ covering over sixty square miles (155 square kilometers). Geologic reports indicated that the playa basin is filled with a sequence of sediments and volcanics covered by a thin alluvium layer.

Titan 1 is morphologically and depositionally comparable to the mudstone/claystone projects of the southwest U.S., being very similar to the company’s WEL project claim area, the TLC project and the Thacker Pass projects of Nevada.

To date, we have conducted sampling from north to south a distance of 13 miles and from east to west just over 4 miles. Sample results show high grade Lithium values over extensive distances and the boundaries of the massive Lithium anomaly have not yet been defined.

Titan 2 is a huge dry flat, Endorheic Basin, meaning it has no outflow. Over time this basin has likely been the repository for a vast area of volcanic ash collection stemming from the volcanic activity to the north.

The Titan 2 target area measures approximately 12 square miles (over 30 sq kms) in size and initial sampling on the prospect has returned high value Lithium within the surface sampling of up to 9,000 ppm (1.93% Li2O).

A second round of sampling of the Titan 2 prospect was performed by collecting samples over a large grid measuring approximately 2.5 by 2 miles and we are awaiting the results.
Bullish
Bullish

The Dog that doesn't bark is the one to pay attention to