InvestorsHub Logo

F/T

Followers 12
Posts 1336
Boards Moderated 0
Alias Born 04/12/2019

F/T

Re: None

Monday, 06/12/2023 10:15:01 AM

Monday, June 12, 2023 10:15:01 AM

Post# of 2300
Applied Digital Announces Successful Integrated Systems Test at Jamestown, North Dakota Facility for HPC Deployment

DALLAS, June 12, 2023 (GLOBE NEWSWIRE) -- Applied Digital Corporation (Nasdaq: APLD) ("Applied Digital " or the "Company"), a designer, builder and operator of next-generation digital infrastructure that is designed for High Performance Computing (“HPC”) applications, today announced that its Jamestown, North Dakota facility successfully passed the Integrated Systems Test (IST) for its first 200KW of HPC equipment and systems.

The Integrated Systems Test is the final step in ensuring that all systems, including powered equipment, operate in accordance with the design intent. This comprehensive test verifies the performance and reliability of the systems under load, including power cuts. It serves as a crucial evaluation that determines whether the design, equipment selection, and construction meet the expected performance standards, ensuring optimal reliability and high availability.

“This is a pivotal step for the Company as we continue to build out our ultra-efficient HPC digital infrastructure,” said Applied Digital CEO and Chairman, Wes Cummins. “This has truly been a company-wide effort and reaffirms our confidence in our datacenters’ reliability and performance for customers. This is a significant proof-point of a process we started over a year ago with a proprietary datacenter design to serve high power density workloads in purpose-built digital infrastructure. We are excited for the future and look forward to the successful development of phases 2 and 3 in the same building that are currently underway and are expected to be fully operational by the end of the year. With the significant amount of demand we are currently seeing for this style of digital infrastructure, we expect to continue to build out our current capacity pipeline to over 200MW. In addition to providing colocation capacity, our digital infrastructure is an important differentiator for the new Cloud Service offering through Sai Computing, our wholly-owned subsidiary.”
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent APLD News