Oh my goodness! LOL! What exactly is this? It purports to be some kind of proposal for a new refinery. Is that it? And the process diagrams? Copied from text books? And the pictures? KNPC operations? It reads like a history of an existing refinery somewhere:


...
There are three Hydrogen manufacturing Units in Shuaiba Refinery
...
The old Vacuum Section of H-Oil Unit was abandoned in early 1978 due to
capacity limitation and a new Vacuum Section, Unit – 63, was provided.
...
The original design capacity of unit 04 is 600 LT/D. but under normal operation, sulfur production is 430-460 LT/D. However, after implementation of Oxygen Enrichment Project in 2004, the capacity of the unit increased to 665 LT/D of sulfur product (700 LT/D of sulfur feed) but not operated under Oxygen enrichment mode.
...
The Unit is designed to process 180,000 BPSD of Kuwait Export Crude Oil.
...
Since commissioning, the Unit operating mode has been modified to suit the prevailing refinery operating pattern. Now, up to 25,000 BPSD of Vacuum bottoms is being processed in each Train.
...
The design capacity of the Unit is 9300 BPSD. At present, unit is operating at 12000 BPSD feed rate
...
Acid gas removal plant treats West Field Gases and West Field Liquid for removal of Hydrogen Sulfide and Carbon Dioxide using Benfield Solution to provide sweet gas product to LPG Plant at Mina Al-Ahmadi Refinery