https://miningdataonline.com/property/1004/Selinsing-Mine.aspx
A nice compact summary of the operational parameters of the Selinsing extended mine including BR.
Note that the entire oxide operation including the oxide plant will shut down as soon as commissioning of the FP begins, now scheduled for October.
Note also that there are 2.3 million tons of low grade oxides in the 2P reserves and 3.4 million tons of Sulphides.
These 2P sulphides form the current mining feed for the FP....about 3.5 years @950,000 tons per year.
There are more than that in the M &I categories but these are not yet considered of sufficient sampling density to convert to Mineable..ie 2P.
by nozzpack

Liked By
Spread the love. Be the first to like this post!
Metatron Releases All-in-One Artificial Intelligence Mobile Apps for iPhone and Android • MRNJ • Mar 27, 2023 9:00 AM
Memorandum of Understanding With Miranda Water Treatment Systems and Rainmaker Worldwide Inc. Extended • RAKR • Mar 27, 2023 8:50 AM
Hollywall Entertainment Inc., (OTC:HWAL) Announces the completion of its 2021 and 2020 Audit (s) • HWAL • Mar 24, 2023 12:48 PM
Glucose Health, Inc. Fiscal 2022 Annual Report • GLUC • Mar 23, 2023 3:23 PM
Nextech3D.ai Announces Its AI-Powered SaaS Platform Toggle3D Experiences A +963% Jump in Users in 60-Days Crossing Over 1000 Users • NTAR • Mar 23, 2023 7:07 AM
Lifecycle Assessment by Benchmark Shows TMC's NORI-D Nodule Project Could Outperform Land-Based Routes of Producing Nickel, Copper and Cobalt in Almost Every Impact Category Analyzed • TMC • Mar 22, 2023 1:44 PM