InvestorsHub Logo
Followers 10
Posts 543
Boards Moderated 0
Alias Born 01/28/2022

Re: WiseYoda post# 49111

Wednesday, 06/01/2022 8:54:35 PM

Wednesday, June 01, 2022 8:54:35 PM

Post# of 54324
MJ01 had a small flare stack mounted to a gas scrubber. I posted the pics of the 65ft flare stack elsewhere for MJ02 that tisdal posted here. There is a big difference between the MJ01 wildcat and this cased, cemented, and completed MJ02 exploratory well. Very big difference.

Whether the added storage tanks constitute a production battery is my speculation but I am confident it truly is for separation of completion fluids into each vessel for holding, testing, and possibly transport to a refinery. An intermediary for a production tank battery if you may. There are extra pallets of baryte and bentonite there also which will be used to formulate the completion fluid used for flow testing. Could be other dry materials as well. MJ02 is setting up for the barrage of reservoir testing now which could easily lead into a definition of a production field. Moving the rig for an appraisal well #3 coupled with a large frac job with the xmas tree installed on the BOP stack for MJ02 could be next.

Brass in Dallas. Brass in Israel. Meetings with the State and municipalities are probably still happening. This is no joke and something big is going to happen next week before or after the ASM. There has not been a better time for a commercial discovery announcement except now.



Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent ZNOG News