InvestorsHub Logo
Followers 22
Posts 888
Boards Moderated 0
Alias Born 05/09/2012

Re: maheu86 post# 101201

Wednesday, 05/25/2022 8:52:17 AM

Wednesday, May 25, 2022 8:52:17 AM

Post# of 194839
I believe the difference was that the previous PR focused specifically on the Polymer, not verified operability/reliability within a modulator in a commercial setting.

This PR focuses on verified testing results over time (3000+ hours) of the polymer inside an operating modulator - demonstrating that what was presented in the 2/10 PR translates from theory/lab settings to actual practice in a commercial setting as anticipated with regard to photostability/reliability.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LWLG News