MJ02 began directional drilling after the 2nd casing run was set at about 2400 meters. As you noted , there is no reason that MJ01 could not begin a directional run at about the same depth and at a different angle to reach another part of the formation. Not sure how this is compatible with MJ01's stated water monitoring mission, but they can work that out.