InvestorsHub Logo
Followers 13
Posts 2033
Boards Moderated 0
Alias Born 07/19/2017

Re: KyOil post# 46369

Thursday, 01/27/2022 5:11:22 AM

Thursday, January 27, 2022 5:11:22 AM

Post# of 54279
KyOil would you speculate that ZN was able to remove all the stuck drill pipe or think thy may have had to abandoned the lowest section of their well 4k meters down & below with remaining drill pipe at cut depth still stuck in place? I'm wondering if their well is still 100% accessible down to target depth?
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent ZNOG News