InvestorsHub Logo
Followers 13
Posts 2033
Boards Moderated 0
Alias Born 07/19/2017

Re: KyOil post# 44867

Thursday, 11/25/2021 9:33:46 AM

Thursday, November 25, 2021 9:33:46 AM

Post# of 54077
If planned for 700 meters sideways (in addition to 5600 meter true depth) then the true length of well is over 20,0000 ft - maybe even 21,000 to 22,0000 ft the limit this rig can bore.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent ZNOG News