InvestorsHub Logo
Followers 10
Posts 1333
Boards Moderated 0
Alias Born 08/31/2004

Re: The_Gman post# 51695

Thursday, 11/18/2021 12:37:21 PM

Thursday, November 18, 2021 12:37:21 PM

Post# of 53946
Page 19 is important as how they evaluate the 3 offers based technical merit and price

Note: For decades Inveris/Meggitt has had a very good relationship with Canada and been the preferred vendor for simulation training.

https://buyandsell.gc.ca/cds/public/2021/03/22/1cae00626dea353376e8d5844b55c190/ABES.PROD.PW__QT.B006.E27974.EBSU009.PDF

The table below illustrates an example where all three offers are responsive and the selection of
the Contractor is determined by a 70/30 ratio of technical merit and price, respectively. The total
available points equals 135 and the lowest evaluated price is $45,000
Offeror 1 Offeror 2 Offeror 3
Offeror Overall
Technical Score
115/135 89/135 92/135
Offeror Evaluated
Price
$55,000.00 $50,000.00 $45,000.00
Calculations
Technical Merit Score (115/135) x 70 = 59.63 (89/135) x 70 = 46.15 (92/135) x 70 = 47.70
Pricing Score (45,000/55,000) x 30 = 24.55 (45,000/50,000) x 30 = 27 (45,000/45,000) x 30 = 30
Combined Rating 84.18 73.15 77.7
1st 3rd 2nd
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent VTSI News