Doc logic: Great questions, I am not sure. However, given that the MHRA inspection was recently completed well past the stated MHRA stated 90 working days) I have been trying to figure out if it was possible for NWBO/advent to modify the May 7th GMP application to add the "Flashworks process"?

My question is if NWBO/Advent were aware of the MHRA delay in the timing of inspection AND the MHRA would allow additions to the application, then there was a window of time when Flashworks could have been slipped in. I highly doubt this scenario could happen because the MHRA would have to keep NWBO/Advent in the loop for schedule and allow modifications to the submitted application while in queue.

Hindsight is always 20/20. Peace.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent NWBO News