InvestorsHub Logo
Followers 63
Posts 6294
Boards Moderated 1
Alias Born 02/09/2007

Re: Byurwherevergirl post# 5450

Tuesday, 09/14/2021 7:27:11 PM

Tuesday, September 14, 2021 7:27:11 PM

Post# of 7858
Yes, I do think they'll utilize the "Managed Pressure Drilling" or MPD that MktMvn spoke about earlier

And I figure that is what he refers to in this latest message

He would know much better that I do what that requires as far as additional equipment

Basically, I believe it is a method to fine tune the drilling fluid pressure in real time to be able to respond to the pressure gradients that fluctuate outside of a more linear pressure/depth profile that is more common

The old standard was to load up the drilling mud with barite to a certain density then just go at it

I'm sure it's far more technical now, especially with synthetic drilling fluids needed for drilling salt (to avoid dissolving the salt with the old seawater/barite mud)

So the bottom line is lessons learned and GSPE will take the steps needed to drill Tau2 without the problems encountered on Tau1

spec

- Foglifter -