InvestorsHub Logo
Followers 1
Posts 1134
Boards Moderated 0
Alias Born 12/29/2016

Re: A Dinosaur post# 41198

Wednesday, 01/20/2021 2:30:38 PM

Wednesday, January 20, 2021 2:30:38 PM

Post# of 47639
That doesn't make sense to me.

If Mexus was using the dual MC and Carbon/Electrowining process previously, that should mean they were operating at or above the 800GMP. Why did that process not require the extra filters then?

If the issue before was a contaminated (salty) leach pad, then once the new pad was up and operational the MC and electrowining recovery process should still be the same. The only change is now it's processing the material from the "clean leach pad.

As for the fluctuating data, my issue isn't PT wanting to give real time data to investors, my issue is, so far, that data has provided no relevancy to how much gold is smelted - and utlimately sold. GPM flow rates, assayed results of X g/t and XX tons of material crushed and leached don't matter until an end product can be smelted and sold for money.