InvestorsHub Logo
Followers 2
Posts 186
Boards Moderated 0
Alias Born 01/15/2020

Re: TAB78 post# 39568

Thursday, 10/15/2020 8:26:58 AM

Thursday, October 15, 2020 8:26:58 AM

Post# of 54194
From a report previously linked:

"On September 21 ZNOG confirmed transportation arrangements for its drilling rig from Romania to Israel. Zion’s drilling rig crew is mobilizing in preparation for an estimated nine days of overland transport in Romania to its departure port. Once at the port, Zion has a confirmed vessel date for sea transport to be October 21, 2020, from Romania and arriving at Haifa port in Israel by October 27, 2020. Zion’s local logistics group in Israel is currently finalizing the rig importation customs paperwork. The first group of rig personnel visas are approved. Both crews are estimated to arrive in Israel by mid-October, 2020. In preparation for the rig arrival, setup, acceptance testing, and spudding the Megiddo-Jezreel #2 well, the conductor pipe has been set to a depth of 110 feet, the cellar has been completed and other finalizations of the pad are ongoing. Zion has finalized arrangements for such essential services as directional drilling services, mudlogging services, wireline/logging services, and cementing services. Much of the necessary additional equipment needed such as drill pipe, casing, mud, chemicals, wellhead, a blowout preventer (BOP) and drill bits, has also been contractually secured by Zion. Upon completing the well monitoring program, the Megiddo-Jezreel #2 drilling campaign will begin, and Zion will spud the well."
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent ZNOG News