Thursday, April 02, 2020 1:10:36 AM
A load beam and trolley system with a chain motor would be the preferred, efficient way of logistics for this, given the ridiculous little pvc gun barrel they intended to shoot these shrimp out of.
These guys are technical morons. The beam required to lift that load given the known vertical support structure, would most likely weight about 15-18 pounds per foot, let say 20 pounds per foot, all accessory load beams required to hold it up. Then the problem is the structure cannot handle this load, much less the chain motor and the live load of shrimp in the net.
A separate vertical support system would have had to been installed, relatively simply when the in ground trough was being built. Would have been so simple to transfer the loading to the concrete walls and the floor structure.
Before you guys say, hey UD, those are 6”x6”wood vertical post, yes they are, but they are already carrying the load of the roof, the lights, all that conduit and water piping ( and the water contained therein) that was never in the original design build of this frame.
But these guys are idiots.
Technically incompetent
But they do know how to build a massive fire. I’ll give them that.
Recent SHMP News
- Form 8-K - Current report • Edgar (US Regulatory) • 09/13/2024 09:04:35 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 08/14/2024 09:01:00 PM
- Form EFFECT - Notice of Effectiveness • Edgar (US Regulatory) • 08/13/2024 04:15:10 AM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 07/17/2024 09:31:02 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 02/29/2024 09:30:30 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 02/14/2024 09:31:02 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/09/2024 11:30:31 AM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 11/20/2023 09:56:11 PM
- Form NT 10-Q - Notification of inability to timely file Form 10-Q or 10-QSB • Edgar (US Regulatory) • 11/14/2023 10:01:21 PM
Dear Cashmere Group Holding Co. AKA Swifty Global Signs Binding Letter of Intent to be Acquired by Signing Day Sports • DRCR • Sep 19, 2024 10:26 AM
HealthLynked Launches Virtual Urgent Care Through Partnership with Lyric Health. • HLYK • Sep 19, 2024 8:00 AM
Element79 Gold Corp. Appoints Kevin Arias as Advisor to the Board of Directors, Strengthening Strategic Leadership • ELMGF • Sep 18, 2024 10:29 AM
Mawson Finland Limited Further Expands the Known Mineralized Zones at Rajapalot: Palokas step-out drills 7 metres @ 9.1 g/t gold & 706 ppm cobalt • MFL • Sep 17, 2024 9:02 AM
PickleJar Announces Integration With OptCulture to Deliver Holistic Fan Experiences at Venue Point of Sale • PKLE • Sep 17, 2024 8:00 AM
North Bay Resources Announces Mt. Vernon Gold Mine Bulk Sample, Sierra County, California • NBRI • Sep 11, 2024 9:15 AM