InvestorsHub Logo
Followers 11
Posts 1359
Boards Moderated 0
Alias Born 08/23/2014

Re: mr_sano post# 49455

Thursday, 01/16/2020 4:55:47 PM

Thursday, January 16, 2020 4:55:47 PM

Post# of 57170
Completely incorrect.
You give a statement that sounds concise, but your time frame is far from that.
You give a minimum time of 3 months with a 100% increase variation of the minimum, this unwinds the concise nature of your statement.

If your going to give a statement of minimum requirements you would be better listing any processes to be evaluated rather than making a timeline.

“AOT has been inspected, certified, and approved to meet or exceed the specifications and quality control requirements of all applicable industrial testing and certification laboratories, leading midstream producers, and transportation entities”

Results will be instant, viscosity can be measures anytime downstream of AOT.
Previous Pilots have shown the upstream pump (Transcanada Keystone Pipeline) pump station 29 was turned down 72% to move the same volume of oil, that was within hours of AOT being turned on.

There are however some areas that will need to be measured over extended periods of time, wax build up is a long term process, and to measure the reduction will also take a long term to establish. That will be additional benefit that is not currently being promoted.

There are science papers on the QS Energy web page that explain this.

To prevent wax buildup in addition to the viscosity reduction benefits is an incredible combination!
To give an example in Australia there are no pipelines big enough for a full size AOT, but there are many that would benefit from the prevention of wax build up.


AOT is like a Swiss multi knife, it has many functions.


AOT results can be published within a day, but it is expected that results and data will be published and released at multiple timeframes inclusive of early operations.

The current installation requires 2 additional units to recognise the full benefit over the pipeline length, if early testing is within expected range, those units will be required to be contracted in a revenue generating capacity for QS Energy, this could be lease or sale.

Smile results will be quick!

Recent field tests with a crude oil pipeline fully confirm the theoretical results.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent QSEP News