InvestorsHub Logo
Followers 31
Posts 7695
Boards Moderated 0
Alias Born 01/24/2007

Re: NorthShoreTrading post# 49452

Thursday, 01/16/2020 12:59:24 PM

Thursday, January 16, 2020 12:59:24 PM

Post# of 57057
Any field test of industrial pipeline components, especially one with a high voltage current flowing within it, would take at minimum 3-6 months of testing to verify results. The suggestion that results will be known within a week or two ignores the actual safety and durability protocols of domestic pipeline operators.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent QSEP News