I thought I heard they were replacing a main water line!? If that is the case, something was not up to code and the landlord would have had to bring that up to snuff before any entity could occupy the space much less sign a contract! Then that would need to be re-inspected for compliance. Possible the repair had a impact on the existing structure to the point that it would require alterations to any proposed floor plan for S&L cafe. Redraw and resubmit plans. Chain of events happen! Been in construction and design for 25 years, everything takes time and adds up fast. I have complete confidence things are moving forward as they need to just as they have with Midtown and Tempe.

$FUNN things are happening!