InvestorsHub Logo
Followers 52
Posts 10857
Boards Moderated 11
Alias Born 06/25/2009

Re: None

Saturday, 09/21/2019 2:24:51 PM

Saturday, September 21, 2019 2:24:51 PM

Post# of 573
The current schedule shows that fabrication and all associated piping, electrical and control systems of Phases 1 and 2 will be completed by early Q3/19. Upon completion, the Phase 1 and 2 modules will be disassembled and trucked to the in-field location at Lanxess’ South Plant facility in southern Arkansas.


The Demonstration Plant is a large (20 m x 20 m x 11 m tall) industrial scale modular facility (see photograph below taken on May 29th 2019) that is designed to process tailbrine from the Lanxess South Plant post bromine extraction. The Demonstration Plant is based on Standard Lithium’s proprietary technology, that uses a solid sorbent material to selectively extract lithium from Lanxess’ tailbrine. The design of the Demonstration Plant has been refined based on Standard’s two years of successful bench and mini-pilot-scale work completed at several facilities across North America; this work has been completed on both a batch and continuous flow basis. The Demonstration Plant will consist of 18 separate modules, split into three phases, and the final modules will be transported to the Lanxess South Plant in late Q3/19.
https://finance.yahoo.com/news/standard-lithium-provides-progress-industrial-070100696.html

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent SLI News