InvestorsHub Logo
Followers 105
Posts 18496
Boards Moderated 3
Alias Born 04/22/2010

Re: tkg post# 47732

Friday, 08/23/2019 7:14:42 AM

Friday, August 23, 2019 7:14:42 AM

Post# of 199016
Tkg, in Dr Lebby's WTMF presentation from June 2019 on Slide 16 it shows 800Gbs and 1.6Tbs devices being introduced in the 2023-2025 timeframe, but the adoption rate for those speed nodes remain small compared to 100Gbs and 400Gbs speed nodes all the way through 2030

This is great news for LWLG, as the optimized 100Gbs devices Gen 1 (3V) and Gen 2 (sub1V) will be the Industry's ONLY solution provider for the 400Gbs speed node at SIMPLE/CHEAP NRZ/OOK, none of the Legacy technologies can get there!

https://b2icontent.irpass.com/2252/177471.pdf

Also of interest is the LWLG MCM shown on Slide 42 demonstrating the Route to multi-100Tbps PCP-MCM

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LWLG News