InvestorsHub Logo
Followers 703
Posts 36440
Boards Moderated 0
Alias Born 04/07/2006

Re: truethat post# 5843

Thursday, 10/26/2006 7:28:33 PM

Thursday, October 26, 2006 7:28:33 PM

Post# of 38056
I saw two large DynoValvePro's being tested on a new International diesel engine. It is being tested at the C.E.E. facility portion of the warehouse. It has to test for a minimum of 1000 hours to be certified by the CEE.

I asked about production dates also. Greg does not want to be held to a time frame or promise a certain date. He wants to have everything completed in a precise sequence as to not repeat past delays and/or mistakes. My estimate would have to be put at April or May. Could be sooner if certain things happen as planned. But we all know about unanticipated problems.

At this point in time, the entire facility is being prepped for both production and a research facility. The ceiling equipment cranes have been installed and are operational. Part of the problem with the current delay was that in order to install the cranes, all of the machinery had to be reset in one of two warehouses. Once the first warehouse was equipped with the crane, all of the machinery had to be moved from the second warehouse to the first in order to install crane number to in the second warehouse. A lot of moving, and those are sum huge and heavy machines that had to be relocated. The electrification of the warehouses is now being done.

Act in Spite of Fear and Uncertainty

Blockman

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.