Meaning that only the MIM process required the power upgrade due to sintering.

LK and Engel Machines do not draw the same amperage that a sintering machine does. So they were able to operate on the original circuits.

Nothing earth shattering here.

Thanks for the inquiry.

PS As per an earlier post, the electrical room had to be increased 120 square feet to accommodate the additional transformer to handle the increased loads required for the Sintering (MIM). While I am sure that there was some shutdown of power during the installation of the additional transformer, I would doubt that it impacted production on the LK and Engel machines for a long duration.

Again. Just my conjecture that not all production ceased during the waiting period between OH and transformer installation.