InvestorsHub Logo
Followers 25
Posts 3341
Boards Moderated 2
Alias Born 01/21/2009

Re: Edge83 post# 2198

Monday, 03/05/2018 11:01:38 AM

Monday, March 05, 2018 11:01:38 AM

Post# of 4985
Golden Predator Commences 2018 Winter Drill Program at 3 Aces Project

Vancouver, BC, March 5th, 2018: Golden Predator Mining Corp. (TSX.V: GPY; OTCQX: NTGSF) (the “Company” or “Golden Predator”) is pleased to announce it has commenced a 4,000 m diamond drill program at its 100% owned 3 Aces Project in southeastern Yukon. The drill program will initially focus on stepping-out with wide-spaced drilling within the Central Core Area, testing continuity along favorable stratigraphic-structural contacts along the Hearts-Clubs corridor and from the Spades area, now believed to represent the down dip extension of the Hearts-Clubs corridor (GPY NR February 26, 2018). Results from 2017 drilling along the Hearts-Club Corridor include 19.81m of 3.32 g/t gold from a depth of 10.67m (3A17-203), and 4.57 m of 81.35 g/t gold from a depth of 0.76 m (3A17-208) at Spades (GPY NR October 25, 2017 and January 16, 2018).

Winter drilling in the Central Core Area is intended to test the Company’s conceptual model ahead of planned work along the Sprogge-Central Core trend as a part of the Summer drill program. The winter program is expected to take approximately 6 weeks to complete the planned 4,000 m. A total of 17,000m of drilling is planned for 2018: 4,000 m winter diamond drilling; ~6,000m of diamond drilling; and ~7,000m of reverse circulation (RC) drilling.

To view maps of the 3 Aces Project and the Central Core Area please visit:

http://www.goldenpredator.com/_resources/maps/3-aces/GPY-18-08-3AcesMaps.pdf

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.