What constitutes a material event? Since SOMETHING had to occur on 6/29 would it not be considered a material event which must be reported within 4 business days? 1) If the debt was repaid on or before 6/29 as required? 2) If the due date was extended beyond 6/29 for reasons yet to be announced? 3) If ISC defaulted on it's debt?