InvestorsHub Logo
Followers 83
Posts 11744
Boards Moderated 0
Alias Born 01/19/2014

Re: Getitgogone post# 111477

Tuesday, 04/22/2014 2:11:40 PM

Tuesday, April 22, 2014 2:11:40 PM

Post# of 194798
And therein lies the rub. One does not just pour a floor and set a 200 ton vault on top of it. The vault would need it's own foundation.

Oddly enough, the requirements for a level 10's vault as listed on HC's site, mentions poured concrete walls. There's nothing in there about a lego vault. And then there is the grid and the steel mesh, both of which will be problematic for a lego vault.

The most important part of a microbiologist's job is not letting the little things get to him.