It makes sense that the floor would have been poured in March as your investigation showed based on the construction worker you spoke with Rolph;That would give the concrete time to cure,so that it wouldn't get any stress cracks in it from having the weight of the vault placed on it.What was the weight ? Something like 200 tons?