Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
And the Pspw team thank you for your efforts, Why did they put out a newsletter before a filing? IMO The management realizes what the shareholders have endured, also It's kind of like the alert firework that is shot before the program starts.
Top/Pspw
Number 11 breakout Board we need a few more posts
Top/pspw
Well that takes us back to the related parties and related entities receiving shares that have been disclosed in the sec filings for several years since the press release below. Many shares may be accounted for.
http://www.prnewswire.com/news-releases/3power-energy-group-shareholders-and-principal-creditors-convert-their-debts-into-equity-in-the-company-136236298.html
Top/Pspw
Your mind is opening up, Are you ready for the Dark pool?, The trades that happen and we do not even know about.
Hypothetically if you were going to offer allotments of shares to generate additional funding say at a investment summit! Your pools of shares for investors will be in place to receive maximum return for investors,(possibly) before execution. Just something to think about, IMO
http://www.investopedia.com/articles/markets/050614/introduction-dark-pools.asp
Top/Pspw
And creeping up to 23 now on breakout board,
Top/Pspw
Agreed, and Joe, I seen reviews of your investment firm in the research
Top/pspw
Very Nice!! always look at the small print Investars is not,I mean not, a small Internet posting site, A major researcher for Institutional investors,,This pertains directly to PSPW and I'm not sure why your other post was removed as you tried to explain.
http://www.investars.com/
Top/PSPW
I think That's when the change occurred on website
Top/pspw
Shala will generate
Search Results
17000000 Euro equals
20,041,045.00 US Dollar
Top/pspw
Great find and thanks for watching
Top/PSPW
Yes revised projects with the Ministry of energy for the Shala River, This is 84mw of the 350mw from the financials.
Thanks for watching websites, Never know when something will turn up.
Top/Pspw
Just checking in and seen that must be like a Indian smoke signal lol
Big dam talking to running river
Top/pspw
was that 100 shares?
Top
From looking around it's really hard to pin it down until we get the specs on the height of the Dam and other info, enthalpy has a good engineering background on this and I posed the question to him several days ago. But I did find this and I'm just going to through it out, from a 100Mw USA project. The pricing of there power is a little different in the Balkans, I struggle with that part figuring it in.
20 million a year.
Profit= (100MW)*(365days/year)*(24hours/day)*(62USD/MWh)*(0.6) - (50USD/kW)*(100.000kW) = 27.587.200,00 USD
They have the Tariff rate greatly reduced and other factors
This is only 84mw of 350mw from the filings
Top/Pspw
very nice digging thanks
Bulletin No. 36 dated 11 September 2017
Public Procurement Agency
MINISTRY OF ENERGY AND INDUSTRY
Concession procedure / public private partnership
Short description of the contract:
Object of the contract Concession of the hydropower plant "Shalë"
Contract Form
B.O.T (Construction
-
operation
-
transfer)
Source of Financing Private Trade Company / Private Capital
Estimated project value: 11,239,204,263
29
Lek (without VAT)
Duration of contract: 35 years
Public Announcement Bulletin No. 25 dated 27.6.2017
We inform that these bidders have participated in the procedure with the respective offer offered:
1. Provisional Union of Societies "Çinar
-
San Hafriyat Nakliyat Insaat Turizm Sanayi Ve
Ticaret LTD.STI "," Shala Energy PLC "and" Falak Properties LLC "
• Fu
installed heater with a calculated flow rate of 83,450 kW
Electricity production 321,465,632 kWh
• The value of "Concession Fee" 2.1% (6.750.778 kWh)
• Implementation time 36 months
• Cost per unit of machinery and
Equipment per kW
installed power 63,664 leke / kW
Value of investment (excluding VAT) 11,239,204,263
29
Leke
Bulletin No. 36 dated 11 September 2017
Public Procurement Agency
Ministry of Energy and Industry announces Mr. Wolfgang Heinl, Representative of Society "Shala
Energy PLC ", Representative of the Provisional Union of Societies" Çinar
-
San Hafriyat
Nakliyat Insaat Turizm Sanayi Ve Ticaret LTD.STI "," Shala Energy
PLC "and" Falak Properties
LLC "with address: No. 1 Main Street, Blessington, County Wicklow, Ireland, to the submitted bid
on 25 July 2017, for concession of the "Shale" hydropower plant, was accepted.
The term of your Contract Negotiation will be
life within 60 days of receipt of the notice of the winner.
Temporary Union of Societies "Çinar
-
San Hafriyat Nakliyat Insaat Turizm Sanayi Ve
Ticaret LTD.STI "," Shala Energy PLC "and" Falak Properties LLC "are required to submit
Ministry of Energy d
they Industry the following documents:
Copy of the Notice to the General and Special Conditions Form
Concessionary Contract
\
Public Private Partnership, signed.
Contract Insurance according to the form required in Documents S
tandarte of the Procedure
Competitive, in the value of 10% of the Investment (excluding VAT). The insurance must be submitted no later
than at the time of signing the Contract from both parties.
Original bid printed / printed or in inkjet print, which is not deleted.
The person with him
signing (authorized by the procurator) must sign the Bid by signing
the original of the offer; and signed on each page of the original of the accompanying documents
economic offer. There should be no change in the offer,
deletion or additions, except for
when corrections are signed by the person or persons with the right to sign the bidding.
The original offer must be identical to the bid on the APP website.
If you are withdrawing from connecting
you must notify the contract in writing.
The Classification Notice was made on 16.8.2017
Complaint: No
Please Enlighten us on your viewpoint of the constant 100 share trades that have been placed here. we have seen them, you have seen them, any thoughts?
Dude where you been
Someone said you went to the barn to slop the Hogs
I thought they ate you
Be careful on that European ranch
Top/Pspw
They try to rattle new investors coming in, If someone bought at 9 or 10, they pull it down and make them see a Red loss, been their
We have been beaten and bruised for so long it's just another day for longs,
They say never to believe the story,But with the Research everyone has upturned you just have to make that choice.
Top/Pspw
Whats the volume traded today?
Still hanging around and reading! and buying
Take a peek at these guys
http://www.fermanoglu.com.tr/Projeler/fang-ura-e-fanit-ve-pesgeshit-hidroelektrik-projesi/
I'm trying to figure out if Cinar-san partner on Shala project is working with them, or on another project.
https://translate.google.com/translate?hl=en&sl=tr&tl=en&u=http%3A%2F%2Fcinarsan.com.tr%2Findex.php%3Fsayfa%3Dprojeler%26durum%3D1
The fang project may be a series of dams, I'm not sure. I have emails in.
Also on there home page it shows machine shop refering to equipment available to work with.
Top
This is the construction company that the news point to that will be building the Shala Project
https://translate.google.com/translate?hl=en&sl=tr&tl=en&u=http%3A%2F%2Fcinarsan.com.tr%2Findex.php%3Fsayfa%3Dprojeler%26durum%3D1
Top
Kind of interesting
Look at Cinar-San link below, on the bottom of page you will find
GTIP 94054010 this is a import number for products they must use.
https://translate.google.com/translate?hl=en&sl=tr&u=http://www.cimentobirlik.org/FirmaDetay%3Funvan%3D%25C3%2587INAR-SAN%2520HAFR%25C4%25B0YAT%2520NAKL%25C4%25B0YAT%2520%25C4%25B0N%25C5%259EAAT%2520TUR%25C4%25B0ZM%2520SAN.%2520T%25C4%25B0C.%2520LTD.%2520%25C5%259ET%25C4%25B0.&prev=search
Here is what the import number references to.
http://www.exportimportstatistics.com/HS-Codes/Lighting-set-of-a-kind-used-in-operation-theatre-Hs-Codes-94054010.aspx
Mr Falaknaz said in his interview with Jo Vetem that they found a company that build the Glow park that did it very well and efficiently, maybe he's working with them more?
Top
ÇINARSAN Head Office Building
Project Name: ÇINARSAN Head Office Building - 500 m2 / 12 people Year of Design: 2015 Year of Implementation: 2016 Architectural / Interior Design Work in Work Work in Work Other 3. Parties: Month of project completed, year: 2016 * All Units Office Solutions * Work Station * Administrator * Operational * Standby * Meeting * Storage 2
office view link below
http://workinwork.com.tr/cinarsan-merkez-ofis-binasi/
Top/pspw
Understood, but If this ever takes off and somebody calls you lucky, Make sure you tell them how you earned it. Not Lucky
Top/Pspw
400 kv line Kosovo-Albania,
Germans resolve the stalemate
This needed to happen
The 400,000 kv interconnection line Kosovo-Albania, which is out of function for two years despite its completion, seems to be entering a new phase. This is related to the solution of the cripple between Kosovo and Serbia, which hinders the hiring of this investment tens of millions of euros. The Energy Community Secretariat warned that the German government has asked the Secretariat to take over the interlocutor's role. The role of the German government is not casual in terms of the German bank KFW itself financing this investment.
Below the full notification of the Secretariat:
The Government of the Federal Republic of Germany, represented by the Ministry of Economic Development and Cooperation (BMZ), asked the Energy Secretariat to facilitate negotiations between Serbia and Kosovo to resolve disputes between EMS and KOSTT. The German ministry is particularly concerned because disputes are hijacking investment in the energy sector in the region and are blocking the integration of the regional energy market in the Western Balkans.
The Secretariat has mediated the settlement of the dispute between EMS and KOSTT even earlier, mediating which resulted in the signing of a bilateral agreement. However, these agreements have not been implemented and the conflict has remained unresolved. The mediation of the dispute between EMS and KOSTT is envisaged by the CONNECTA program for the regional energy market in the six Western Balkan countries, which the Secretariat applies for the European Commission.
The secretariat will now mediate the settlement of the dispute between the two governments
https://translate.google.com/translate?sl=auto&tl=en&js=y&prev=_t&hl=en&ie=UTF-8&u=http%3A%2F%2Fshqiptarja.com%2Fekonomi%2F2733%2F0%2F1&edit-text=&act=url
Here are some recent comments from the Energy Minister from the recent Parliament session, (Connect the dots)
The Government will aim at further development of the power sector, also by consolidating a reform that has yielded results, consolidating financial, operational and technical sustainability with a view to meeting the growing demand for domestic energy, having as a priority the integration of the domestic energy market in regional and European markets, and by reducing dependence on imports.
The prolonged drought this year, with the worst of the last 10 years, was a successful "stress test". Unlike before when everything was downloaded to the State Budget, this time, sector companies managed to manage their own unpredictable situation, drastically reducing the need for government money injection into minimal values. Let us not forget that years ago the State Budget extracted money from investments, etc., only to ensure the supply of electricity. The crisis showed that energy reform has yielded results. We do not say that we are where it was needed, because it faced financially the most difficult crisis of the last 10 years without creating serious financial stress and questioning the country's financial stability.
The Government will aim to deepen the reform and the continuation of the investment program to ensure the security and quality of supply through: (a) increasing generation capacities; (b) diversification of resources (aquatic and windy); (c) increasing cross-border transmission capacity within the country; (d) continuation of the OSHEE allocation process under the law of the electricity sector; (e) Continuous reduction of losses in the distribution network, ensuring access to new resources and their development; (f) the creation of a stock exchange and an organized energy market; (g) strengthening the independence of the regulator; (h) market integration with Kosovo and regional ones; (i) Full approximation of all sectoral legislation to European law; (j) investment stimulation; (k) continuation of the uncompromising battle with corruption and theft of electricity.
In the next four years, 170m euros will be invested in strengthening the generation capacities and dam safety managed by KESH sha society.
Transmission will be realized 160m euros in investments, one of the most important being the construction of the 400kV line between Albania and Macedonia, which closes the cycle of interconnection links with neighboring countries. It denies all the conjecture that Albania has not benefited, but this money is benefited by Albania and Macedonia for this project. The interconnection cycle is closed, so Albania will have a network connected with Montenegro, Greece, Kosovo and Macedonia. The thing that will create the necessary premises to export the potential surplus that may come from the increase of energy production in Albania.
The government will continue with the process of allocating energy distribution and supply functions to OSHEE by creating two separate companies aiming at improving the supply of services to citizens and channeling investment in distribution.
This sector is expected to realize a total investment of around 520 million euros, the vast majority of which with its own company funds. Part of this investment package will also be projects with the World Bank, German KfW Bank for the Skada system and Smart Meter reading. I am convinced that the Albanian distribution system is renewed at 60-70% of it. Within current tariffs, with current performance plans and further reduction of losses, we have the opportunity to have energy in most Western plains and major centers as any other European country and people are seeing these things daily .
Increasing energy production from renewable sources will be encouraged to ensure sustainable development in order to increase the diversification of alternative and environmentally friendly energy sources as well as the implementation of new net energy measurement schemes from production plants solar and wind power for all self-producers, household customers, or businesses.
Will continue private investment in energy. We will create the conditions for these investments to continue to progress, because these investments have progressed in these years due to the increase in liquidity in the electricity sector. I am convinced that in 2021, Albania will have another 300 mega-meters installed and these from foreign and domestic investments. The procedure for Kalivaç will soon be completed as well as many other concessionaires who, with their investments and their risk without seeking guarantees for energy purchases, will increase foreign investment but above all will increase production of electricity in Albania.
This will make Albania, in addition to its hydro production, also the production of energy from solar energy and wind. We already have an approved plan, we have an approved fee, started the first applications and we will soon organize the biggest auction together with the Bank for Reconstruction and Development to set up the largest photovoltaic plant ever made in Albania and aim at at least 30 megawatts, which will be integrated with the Albanian power grid. In the national plan, which is funded because there is a regulated fee, 30 megawatts of wind is also provided. It means that Albania also starts with these alternative energy to diversify its portfolio.
In the renewable energy sector, the expected investments in the generation of solar power generation plants are about 150 million Euros, with up to 2020 installed about 50 MV with regulated tariffs. From wind power sources, the expected investments will be approximately around 60m euros, with up to 2020 30mph will be installed at regulated tariffs.
With regard to new water resources, the Government will maintain the pace of growth of these resources by creating a favorable investment climate for them, with an expectation for upcoming private investments of around 400m euros, with a capacity of about 300 Most installed .
Another goal of ours will be to put into operation Vlora Power Plant, but already connected to the gas network. That failed power plant and without any economic logic because it is calculated to work with oil, there may be hope to revive the connection to the gas grid. We are completing the full study to start the concession, namely the launch of a tendering process to select a public-private partnership with an investor in order to make gas conversion, gas connection and its inclusion in the portfolio of energy production in the country.
We will pursue the policy of increasing the guarantee and long-term security for investments made in hydro resources, transforming contracts in accordance with European best practices on administration and ownership rights from BOT to BOO. Because it goes hand in hand with the development of the market, with liberalism, with the creation of a stock exchange, with European directives. But above all, it will create an asset in the hands of all Albanian investors, will create choleratisation opportunities, but above all securitization of all their investment. This means all these investments, all these businessmen who have invested in hydropower plants will have more opportunities to generate investment from financial institutions. These investments will make the business safer.
Full post below
Top/Pspw
https://translate.google.com/translate?sl=auto&tl=en&js=y&prev=_t&hl=en&ie=UTF-8&u=http%3A%2F%2Fwww.energjia.gov.al%2F&edit-text=&act=url
Thanks for the responses and continued research and digging for info.
Top/pspw
This appears to be the revised Shala projects, But it's going to be one of the largest Dams in the country, reasonable build time and much better percentage rates built in than earlier projects,
And I believe there could be more brewing with the solar projects mentioned and what else?
Top/PSPW
Turkish Construction Company
https://translate.google.com/translate?hl=en&sl=tr&u=http://cinarsan.com.tr/&prev=search
ONGOING PROJECTS
Construction of Albanian Fang Dam and HEPP
Top/PSPW
NEWS FOUND Time to Rise and Shine everyone
11 September 2017 - 17:29 | updated at 21:03
HEC $ 100 mln on Shala River
known as the "Thailand" of Albania
PHOTO / Natural pearl that risks disappearing
More about writing
PHOTO / Natural pearl that risks disappearing
PHOTO
Recently, some impressive photos from a river in North Albania can be seen on social networks, whose images are compared to those in Thailand.
It is about the Shala River, which has become the main tourist attraction of this year with an increasing attendance rate.
For all those who have visited the impressions are the most impressive ones, while those who have not yet been well visited would have to do it as soon as most of them will be overwhelmed by concessions.
There is already a concrete project with three winning companies announced by the Ministry of Energy and Industry.
HEC-I over Shala 100 million USD
The Ministry of Energy and Industry yesterday announced the concession winners for the hydropower plant on the Shala River. Referring to the investment value but to the installed power it seems to be one of the biggest hydropower plants in the country. The winning company is a temporary merger of the companies "Çinar-San Hafriyat Nakliyat Insaat Turizm Sanayi Ve Ticaret LTD.STI", "Shala Energy PLC" and "Falak Properties LLC".
Data on HPP
The installed power specified by the calculator is expected to be 83,450 kW, with an electricity output of about 321,465,632 kWh. The amount of Fees offered for concessions is 2.1% (6.750.778 kWh) and the time of implementation of the works 36 months. The value excluding VAT is 11,239,204,263 Lek.
The interest for hydropower utilization is for the Shala River waters, between the quotas 486 meters above sea level up to 176.00 meters above sea level, which is also the maximum quota of the Komani reservoir, respecting the technical conditions of design and non-violation of objects that are planned to be built in this watershed.
The Shala River on which is planned to build the hydro power plant is one of the Drini River branches that supplies the Drina cascade, which is the most important energy works in the country, providing over 90% of the energy in the country.
Top/PSPW
There are also HEC-I Gojan and Bushtrica 1
The Ministry of Energy announced that it has announced the winners for the Bushtrica 1 hydropower plant, which was for more than two months appealed to the Public Procurement Commission. According to the winning announcement for this concession is the company "Doko" sh.pk with an investment value of 506 million ALL without VAT, while the installed power will be 4220 Kw.
For the winning Gojani Hydro Power Plant was announced "MC Inerte" sh.pk with an investment value of 1.9 billion ALL.
Winning companies for three HECs should submit additional documents to the ministry to open the way for signing the final contract. / Monitor
https://translate.google.com/translate?sl=auto&tl=en&js=y&prev=_t&hl=en&ie=UTF-8&u=http%3A%2F%2Fshqiptarja.com%2Fekonomi%2F2733%2Fhec-100-mln---mbi-lumin-shal-s--i-njohur-si-tajlanda-e-shqip-ris--440355.html&edit-text=&act=url
Top/PSPW
Be safe my friend
Top
Banned on other because I called them on the libel and slander they had done in the past
My legitimate response are deleted for DOLV saying there off topic, When their very much on topic, very sad, read and learn
http://investorshub.advfn.com/boards/read_msg.aspx?message_id=47614471
The 700 million share loading in Feb establishing positions,
Then begin leaking information out, A group of traders either in the same room our working throughout a network, probably being paid to post.
Controlling the price at the end of the day making it look as if the stock is stable while selling of accumulated share's continues daily, drawing in new investors.
The perfect storm lining there accounts.
any thoughts on price after the energy world hears?
Well this is what our hopes are holding out for. It's not PSPW This time, but this is what it looks like when it happens and it is pretty exciting when it does. Halted pending news.
This one is in my Top 30 swing trading list and also why I keep PSPW on my list for reference, because with our volume, you would never know.
Halted 09/06/17 at 16.56 pm pending news
I didn't see it till he just had a interview on weekend press show talking about situations