Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
West Red Lake Gold (WRLG.v WRLGF) applies learnings from Madsen's bulk sample to optimize mine planning w/ larger stopes, improved efficiency & lower costs. Definition drilling & a higher long-term consensus gold price (US$2,350/oz) increase economic ounces & suggest a longer mine life. More⬇️
https://www.reddit.com/r/Canadapennystocks/comments/1l2qne3/west_red_lake_gold_wrlgv_wrlgf_highlights_bulk/
TODAY: West Red Lake Gold (WRLG.v WRLGF) reports that insights from its test mining and bulk sample at its 100%-owned & operational Madsen Gold Mine are leading to a mine plan with larger stopes, improved efficiency, and lower costs. The program confirmed modelling accuracy and optimized mining scenarios.
https://westredlakegold.com/west-red-lake-gold-highlights-bulk-sample-learnings/
*Posted on behalf of West Red Lake Gold Mines Ltd.
West Red Lake Gold (WRLG.v WRLGF) has restarted underground mining at Madsen ahead of schedule and recently reported high-grade drill results from the project's South Austin Zone, including 61.51 g/t Au over 12.1m. Drilling continues to define zones near development to support the ramp-up.
https://westredlakegold.com/west-red-lake-gold-intersects-61-51-g-t-au-over-12-1m-43-54-g-t-au-over-8-35m-and-24-61-g-t-au-over-11-2m-at-south-austin-madsen-mine/
*Posted on behalf of West Red Lake Gold Mines Ltd.
West Red Lake Gold (WRLG.v WRLGF) has restarted its high-grade Madsen Gold Mine in Ontario, targeting 67,600 oz/year & US$94M in free cash flow. Backed by strong funding & bulk sample results, WRLG aims to ramp up throughput & drive long-term growth w/ continued exploration. Full breakdown here⬇️
https://www.reddit.com/r/PennyCatalysts/comments/1kxuox4/west_red_lake_gold_wrlgv_wrlgf_restarts_highgrade/
As highlighted today in Streetwise Reports, West Red Lake Gold (WRLG.v WRLGF) has restarted its high-grade Madsen Gold Mine in Ontario, targeting 67,600 oz/year and US$94M in annual free cash flow. Backed by strong bulk sample results, ongoing exploration and solid funding, the mine is positioned for growth amid near ATH gold prices.
https://www.streetwisereports.com/article/2025/05/28/gold-miner-restarts-high-grade-ontario-mine.html
*Posted on behalf of West Red Lake Gold Mines Ltd.
Today, West Red Lake Gold (WRLG.v WRLGF) released a new set of high-grade underground drill results from the South Austin Zone at its 100%-owned Madsen Mine in Ontario’s prolific Red Lake Gold District with highlights including 48.97 g/t Au over 18.7m, 52.86 g/t Au over 4.5m and 25.49 g/t Au over 7.5m: https://westredlakegold.com/west-red-lake-gold-intersects-48-97-g-t-au-over-18-7m-52-86-g-t-au-over-4-5m-and-25-49-g-t-au-over-7-5m-at-south-austin-madsen-mine/
With strong gold prices, excellent reconciliation results from bulk sampling, and continued success from underground definition drilling, WRLG is steadily de-risking and advancing toward near-term production at one of Canada’s most storied gold districts.
Additional Info Here: https://www.reddit.com/r/SmallCapStocks/comments/1kdel6g/west_red_lake_gold_wrlgv_wrlgf_approaches_2025/
Marking a rapid two-year turnaround from acquisition to near-term production, West Red Lake Gold (WRLG.v WRLGF) is on track to restart the Madsen Mine in Ontario by the second half of 2025 and highlighted a series of key milestones across drilling, development, mine construction, and infrastructure—executed largely on or ahead of schedule: https://westredlakegold.com/west-red-lake-gold-reflects-on-madsen-mine-achievements-to-date-2/
Notably, having completed more than double its original target of underground drilling, highlighted by high-grade intercepts at South and North Austin, WRLG's Pre-Feasibility Study released in January 2025 confirmed strong project economics, projecting nearly $70 million in average annual free cash flow over six years from the Madsen Mine.
More info on WRLG's latest high-grade gold results: https://www.reddit.com/r/smallstreetbets/comments/1jrpbyb/west_red_lake_gold_wrlgv_wrlgf_reports_highgrade/
West Red Lake Gold (WRLG.v WRLGF) has restarted its Madsen Mill after 28 months and is preparing to process a bulk gold sample. Underground development is accelerating, a new 114-person camp is now open, and the project is nearing gold production in Ontario’s prolific Red Lake district. Full news here: https://westredlakegold.com/west-red-lake-gold-provides-update-on-madsen-mine-restart/
*Posted on behalf of West Red Lake Gold Mines Ltd.
Joining Kerry Lutz's Financial Survival Network, West Red Lake Gold's (WRLG.v WRLGF) Gwen Preston highlighted the company's latest milestone, officially restarting the Madsen Mine Mill:
West Red Lake Gold (WRLG.v WRLGF) is nearing gold production restart at its high-grade Madsen mine in Ontario. A bulk sample is underway to validate its mine plan and WRLG aims for 800 tpd by late 2025, positioning it for a potential substantial re-rating.
Joining The Ellis Martin Report, West Red Lake Gold's (WRLG.v WRLGF) VP of Communications, Gwen Preston, detailed the company's focus on developing the Madson Mine in Ontario’s Red Lake Gold District:
As one of only four new gold mines coming online in 2025, West Red Lake Gold (WRLG.v WRLGF) provides a unique opportunity in restarting production at the Madsen Gold Mine where the company recently released its PFS, using a US$1,680/oz reserve cut-off price - a highly conservative estimate given current gold prices near $2,900/oz:
TODAY: @WestRedLakeGold's Potential Reserve Count + Madsen Pre-Feasibility Study & Mine Restart Plan$WRLG.v $WRLGF
— Stock Master Flash (@StckMasterFlash) February 27, 2025
⭐️Pre-Feasibility Study & Gold Price Sensitivity⭐️
Using US$1,680/oz reserve cut-off price, a conservative estimate given current gold prices of US$2,900/oz,… https://t.co/wUseVyXnIh pic.twitter.com/H7Dv9gJzae
Advancing toward gold production at its Madsen Mine, West Red Lake Gold (WRLG.v WRLGF) recently filed an independent Pre-Feasibility Study (PFS) with a conservative US$1,680/oz reserve cut-off price, despite current gold prices near US$2,900/oz: https://www.thenewswire.com/press-releases/1AMqFaQ0r-this-chart-buried-in-a-technical-report-reveals-west-red-lake-gold-s-potential-reserve-count-in-the-current-gold-environment.html
A sensitivity analysis suggests a potential 77% increase in resource tonnes at a higher gold price, with an estimated NPV of $496M at US$2,640/oz. Mine restart activities are progressing rapidly, with the mill set to resume operations imminently, a bulk sample program underway, and underground development accelerating. WRLG recently closed a C$20M public offering and reported new high-grade drill results from the South Austin Zone. As one of only four new gold producers in 2025, operating in a Tier 1 mining jurisdiction, WRLG is well-positioned for a potential market re-rating as it transitions from developer to producer: https://www.reddit.com/r/PennyStocksCanada/comments/1itl907/west_red_lake_gold_wrlgv_wrlgf_upsizes_20m_bought/
Joining Emerging Growth Conference, West Red Lake Gold's (WRLG.v WRLGF) Gwen Preston detailed the company's plans to transition from a developer to a gold producer at its Madsen Gold Mine in Ontario's Red Lake District in the second half of 2025: :
Announcing major developments unfolding across bulk sampling, underground expansion, and mill restart operations yesterday, West Red Lake Gold (WRLG.v WRLGF) is rapidly advancing toward full-scale production at the Madsen Mine:
TODAY: @WestRedLakeGold Provides Madsen Mine Site Update - Bulk Sample Underway, Connection Drift 80% Complete, Underground Development and Facility Installs Progressing $WRLG.v $WRLGF #Gold
— Stock Master Flash (@StckMasterFlash) February 13, 2025
⭐️Key Developments⭐️
✅Test mining and bulk sampling: Significant progress with… https://t.co/pVIb7zwrGb pic.twitter.com/4TlUdgeQA6
Gearing up to restart high-grade gold production at the historic Madson Mine in Ontario’s prolific Red Lake Gold District, West Red Lake Gold (WRLG.v WRLGF) is aiming for first gold production in March 2025. With gold prices near record highs and mining stocks still undervalued, WRLG is on track for a potential re-rating as the company executes on its restart plan. Hear Gwen Preston, industry expert and WRLG’s VP of Communications, break down why this project could be one of Canada’s most exciting gold stories in 2025:
INTERVIEW SUMMARY: High-Grade #Gold Production This Year - @WestRedLakeGold Gwen Preston on Ellis Martin: https://t.co/Shx0rgwXm3$WRLG.v $WRLGF
— Stock Master Flash (@StckMasterFlash) February 12, 2025
⭐️Company Overview⭐️
➡️Publicly traded gold company focused on developing the Madson Mine in the Red Lake Gold District, Ontario.… https://t.co/G3zgcO4ae5 pic.twitter.com/OYexQX2itb
West Red Lake Gold (WRLG.v WRLGF) is set to restart gold production at Madsen in March, ramping up fully by June 2025. Its PFS outlines 70,000 oz/year over seven years, with potential upside from gold prices and new high-grade zones. A recent sampling program identified six new targets for 2025 drilling. Full news: https://westredlakegold.com/west-red-lake-gold-highlights-new-targets-from-regional-surface-sampling-at-madsen/
*Posted on behalf of West Red Lake Gold Mines Ltd.
New interview from West Red Lake Gold's (WRLG.v WRLGF) Gwen Preston on Ellis Martin, detailing the company's planned high-grade gold production this year:
With a fully permitted and funded operation, a strong turnaround plan, and a focus on efficiency, West Red Lake Gold (WRLG.v WRLGF)is positioned to successfully restart one of Red Lake’s historic high-grade gold mines, as detailed during VRIC 2025:
PRESENTATION SUMMARY: Restarting Production at the Madson Mine - @WestRedLakeGold $WRLG.v $WRLGF
— Stock Master Flash (@StckMasterFlash) February 7, 2025
During VRIC 2025, $WRLG's @miningmavengwen detailed the company's production restart plan at the Madsen #Gold Mine in Ontario's Red Lake District: https://t.co/DX2k6TDrJ8
⭐️Key… https://t.co/tXZw358rbV pic.twitter.com/0MUrry8sUT
During VRIC 2025, West Red Lake Gold's (WRLG.v WRLGF) Gwen Preston detailed the company's production restart plan at the Madsen Gold Mine in Ontario's Red Lake District, highlighting a range of catalysts for the year:
Amid restarting production from the Madsen Mine, West Red Lake Gold (WRLG.v WRLGF) is continuing to add high-confidence ounces to its mine restart plan, recently announcing strong drill results from its definition drilling in the McVeigh Zone, as detailed by Gwen Preston:
Key Updates from @WestRedLakeGold's Madsen Mine$WRLG.v $WRLGF
— Stock Master Flash (@StckMasterFlash) February 3, 2025
As detailed by Gwen Preston, $WRLG provided 2 key updates announcing strong drill results from definition drilling as well as adding high-confidence ounces to its mine restart plan: https://t.co/4GCUJ9A7X5
⭐️Key… https://t.co/Zuw9fDivmh pic.twitter.com/aza8XvUMKV
🟢Another cent bump for $WRLG.v today🟢
— Fantastic Mr.Stocks (@Fantastic_MrSTX) February 5, 2025
🧠A couple IMPORTANT things to keep in mind about $WRLG restarting #gold production especially as price continues to set new ATH🧠
1⃣the PFS only considers 4/7 deposits that make up the Madsen resource (Austin, South Austin, McVeigh, and… https://t.co/LLe9Gt8r7c pic.twitter.com/muAHH9Maqc
As detailed by Gwen Preston, West Red Lake Gold (WRLG.v WRLGF) provided two key updates from its Madsen Mine last week, announced strong drill results from its definition drilling in the McVeig Zone and confirming its high-grade potential, as well as adding high-confidence ounces to its mine restart plan:
West Red Lake Gold Mines (WRLG.v WRLGF) is advancing its planned 2025 restart of the high-grade Madsen Gold Mine.
https://www.proactiveinvestors.com/companies/news/1064605/west-red-lake-gold-mines-ceo-discusses-madsen-mine-pre-feasibility-study-and-next-steps-at-vric.html
CEO Shane Williams highlighted the project's robust economics, conservative 70k oz/year production estimate, exploration upside & recent drill results like 106.99 g/t gold over 2.35m. Full interview breakdown here ⬇️
https://www.reddit.com/r/PennyStocksCanada/comments/1icf8wh/west_red_lake_gold_mines_wrlgv_wrlgf_advances/
Today, West Red Lake Gold Mines (WRLG) announced positive results from the 2024 regional surface mapping and geochemical sampling program at its 100%-owned Madsen Property in the Red Lake Gold District, Ontario: https://westredlakegold.com/west-red-lake-gold-highlights-new-targets-from-regional-surface-sampling-at-madsen/
The program focused on the Confederation Assemblage, an underexplored rock unit known to host significant gold mineralization, and identified six anomalous areas with a geochemical signature (Au-W-As-Ag-Bi) analogous to Madsen-style mineralization. Having delineated a number of high-caliber geochemical anomalies, these results enhance WRLG’s geological understanding and validate the potential for new gold discoveries at Madsen, with drilling and additional fieldwork planned for 2025.
Article Summary: WRLG.v (WRLGF) is gearing up for gold production restart at its Madsen Mine. Global Stocks News highlights the mine's conservatively projected 70k oz annual output & 255% IRR based on $2.2k gold, w/ potential to grow through ongoing tight-spaced drilling, rising gold prices & more⬇️
https://www.reddit.com/r/Wallstreetbetsnew/comments/1i9af1n/west_red_lake_gold_mines_wrlgv_wrlgf_targets_2025/
As highlighted in yesterday's Global Stocks News article, West Red Lake Gold Mines (WRLG.v WRLGF) is advancing plans for a 2025 production restart at its Madsen Gold Mine. Tightly-spaced drilling at the McVeigh Zone aims to strengthen resource confidence, supporting a robust mine plan and future growth.
https://www.theglobeandmail.com/investing/markets/stocks/WRLG-X/pressreleases/30573221/tight-drill-spacing-at-west-red-lake-golds-mcveigh-zone-adds-high-confidence-ounces-to-mine-restart-plan/
*Posted on behalf of West Red Lake Gold Mines Ltd.
Advancing efforts toward restarting production by mid-2025 at the Madsen Mine, West Red Lake Gold (WRLG.v WRLGF) provided an update on the definition drill results from McVeigh Zone with highlights including 45.70 g/t Au over 3.85m, 50.99 g/t Au over 3m and 8.75 g/t Au over 16m: https://www.thenewswire.com/press-releases/1AdyFDqOp-tight-drill-spacing-at-west-red-lake-gold-s-mcveigh-zone-adds-high-confidence-ounces-to-mine-restart-plan.html
Notably, the conservative Pre-Feasibility Study for the Madsen Mine projects $70M/year in free cash flow at $2,200/oz gold, supported by reserves averaging 8.2 g/t gold, producing ~70,000 oz annually over a 7.2-year mine life, with an impressive 255% IRR. Additionally, 1.2 million Indicated ounces remain outside the reserve count, with strong conversion potential. With gold prices forecasted to surpass $3,000/oz in 2025, Madsen's economic outlook is further strengthened. Hosting an NI 43-101 Indicated Resource of 1.65M oz @ 7.4 g/t Au and an Inferred Resource of 0.37M oz @ 6.3 g/t Au, WRLG is well-positioned to deliver a high-grade gold project in favorable market conditions: https://www.reddit.com/r/pennystocks/comments/1i6v9ua/west_red_lake_gold_intersects_4570_gt_au_over/
Yesterday, WRLG.v (WRLGF) reported high-grade drill results from the McVeigh Zone at its near-production Madsen Gold Mine, including 3.85m at 45.70g/t Au & 3m at 50.99g/t Au. Drilling supports resource growth ahead of WRLG's planned 2025 gold production restart. Full news breakdown and DD here⬇️
https://www.reddit.com/r/Wealthsimple_Penny/comments/1i651ix/today_west_red_lake_gold_mines_wrlgv_wrlgf_shares/
Today, West Red Lake Gold Mines (WRLG.v WRLGF) reported high-grade drill results from the McVeigh Zone at its Madsen Gold Project, including 45.7 g/t Au over 3.85m and 50.99 g/t Au over 3m, supporting WRLG's 2025 Gold production restart goals.
https://westredlakegold.com/west-red-lake-gold-intersects-45-70-g-t-au-over-3-85m-50-99-g-t-au-over-3m-and-8-75-g-t-au-over-16m-at-mcveigh-madsen-mine/
*Posted on behalf of West Red Lake Gold Mines Ltd.
Today, West Red Lake Gold (WRLG.v WRLGF) reported high-grade definition drill results from its 100% owned Madsen Mine in Ontario's Red Lake Gold District with highlights including 45.70 g/t Au over 3.85m, 50.99 g/t Au over 3m and 8.75 g/t Au over 16m: https://www.globenewswire.com/news-release/2025/01/20/3011858/0/en/West-Red-Lake-Gold-Intersects-45-70-g-t-Au-over-3-85m-50-99-g-t-Au-over-3m-and-8-75-g-t-Au-over-16m-at-McVeigh-Madsen-Mine.html
To continue building an inventory of high-confidence ounces to support the restart of production, drilling focused on the high-grade McVeigh Zone, which currently contains an indicated mineral resource of 79,800oz grading 6.4g/t Au and an inferred resource of 14,300oz grading 6.9g/t Au, and these results follow up on the significant intercepts previously announced from the zone which included 106.99 g/t Au over 2.35m and 17.77 g/t Au over 5.5 m, respectively.
West Red Lake Gold Mines (WRLG.v WRLGF) has kicked off 2025 right, releasing a positive pre-feasibility study ($315M post-tax NPV), securing a $35M credit facility to fund remaining mine restart costs, and appointing a new VP of Operations.
Notably, the PFS is very conservative as it uses a $2200/ounce Gold cutoff price (gold is currently priced at $2700/ounce), does not include 1.1M oz of resources and has not factored in the recent 50,000+ m of drilling.
Bulk sample mining is underway at the project, with production ramp-up scheduled for mid-year.
More here: https://westredlakegold.com/news
*Posted on behalf of West Red Lake Gold Mines Ltd.
Joining Resource Stock Digest, WRLG's VP Communications Gwen Preston detailed the company's transformative 2024 and goals going into 2025 as it nears production:
With the appointment of Hayley Halsall-Whitney as Vice President Operations, West Red Lake Gold (WRLG.v WRLGF) has strengthened its mine operations team at a vital time for the company as it's advancing the Madsen Gold Mine in Ontario's historic Red Lake District, targeting first production mid-2025:
📰Strengthened Mine Operations Team - @WestRedLakeGold Appoints Haley Halsall-Whitney as Vice President Operations
— Stock Master Flash (@StckMasterFlash) January 15, 2025
$WRLG.v $WRLGF
Boasting over 20 years of experience in Canadian mining, Halsall-Whitney brings a strong track record of operational excellence, with career… https://t.co/Qh5ukdVyq6 pic.twitter.com/rP47w1A565
Yesterday, West Red Lake Gold (WRLG.v WRLGF) announced the appointment of Hayley Halsall-Whitney as Vice President Operations, a strong move in strengthening its mine operations team: https://westredlakegold.com/west-red-lake-gold-strengthens-mine-operations-team-with-appointment-of-hayley-halsall-whitney-as-vice-president-operations/
Boasting over 20 years of experience in Canadian mining, she brings a strong track record of operational excellence, with career highlights including leading Wesdome Gold Mines' Eagle River Mine (2020–2024) to record production in 2021, implementing operational improvements, increasing reserve and resource grades, reducing cash costs, and advancing safety and equity policies as well as holding leadership roles at North American Palladium, Goldcorp’s Porcupine Mine, and Glencore’s Sudbury operations, including work in process control and metals accounting.
Crux Investor highlights WRLG.v targeting mid-2025 production at its high-grade Madsen mine w/ 1.7Moz at 7.4 g/t Gold. Key catalysts include an upcoming PFS, positioning WRLG for a potential re-rating as the market gains clarity on its progress. More⬇️
https://www.cruxinvestor.com/posts/west-red-lake-gold-mines-draw-nearer-towards-2025-production-at-flagship-madsen-gold-project
*Posted on behalf of West Red Lake Gold Mines Ltd.
In a recent video update, Gwen Preston, West Red Lake Gold Mines' (WRLG.v WRLGF) VP of Communications, detailed plans to restart gold production at their Madsen Mine in 2025 and release a new mine plan which integrates high-grade satellite zones like the Fork zone to boost output.
Informative post here on West Red Lake Gold Mines Ltd. (WRLG.v WRLGF) and the remaining fundamental pieces in order to restart the Madsen Mine in the Red Lake District of Ontario, Canada. Also includes a link to a recent presentation from the Deutsche Goldmesse.
https://www.reddit.com/r/Penny_Stocks_Canada/comments/1hhei7e/west_red_lake_gold_mines_wrlgv_wrlgf_working/
*Posted on behalf of West Red Lake Gold Mines Ltd.
West Red Lake Gold Mines (WRLG.v WRLGF) is making significant strides toward its 2025 gold production restart, reporting 50% completion of the 1.2-km Connection Drift at the Madsen Project alongside other critical infrastructure upgrades. The company is also prioritizing exploration at the Fork Deposit, emphasizing its high-grade potential based on historic drill results. Additionally, a pre-feasibility study (PFS) for the Madsen Gold Project is anticipated soon, offering key insights into its restart plans. https://westredlakegold.com/news
*Posted on behalf of West Red Lake Gold Mines Ltd.
West Red Lake Gold Mines (WRLG.v WRLGF) rose 7% on high volume today after unveiling a refined strategy for the Fork Deposit at its Madsen Gold Project yesterday.
With gold production set to restart by mid-2025, WRLG's focus on additional high-grade opportunities supports its growth vision. Full news summary & DD here⬇️
https://www.reddit.com/r/Wallstreetbetsnew/comments/1hbffrm/today_west_red_lake_gold_mines_wrlgv_wrlgf/
Today, West Red Lake Gold Mines (WRLG.v WRLGF) revealed plans to unlock high-grade gold potential at the Fork Deposit, part of its near-production Madsen Gold Project. Hosting 70,400 oz @ ~5.3 g/t Au, Fork’s shallow, high-grade zone near existing infrastructure is prioritized for WRLG's 2025 drilling.
https://westredlakegold.com/west-red-lake-gold-envisions-high-grade-underground-satellite-at-fork-deposit-madsen-property/
*Posted on behalf of West Red Lake Gold Mines Ltd.
BTV recently interviewed West Red Lake Gold (WRLG.v WRLGF) CEO Shane Williams, who highlighted the company's plans to restart gold production at their Madsen Mine by mid-2025.
West Red Lake Gold (WRLG.v or WRLGF) is on track to revive the historic Madsen Gold Mine in Ontario's Red Lake district by mid-2025. With 1.7M oz indicated and 0.4M oz inferred resources & ongoing exploration, WRLG aims to transition efficiently to production💥⛏️
Madsen Mine Site Update: Connection Drift 50% Complete, Primary Crusher Commissioned, Camp Installation Underway
West Red Lake Gold Mines Ltd.
Wed, December 4, 2024 at 10:31 AM
https://finance.yahoo.com/news/madsen-mine-connection-drift-50-153100705.html?guccounter=1&guce_referrer=aHR0cHM6Ly93d3cuYmluZy5jb20v&guce_referrer_sig=AQAAAC6FYTrxPNpFicIraCQEvZyuUTFOn3Ni6setR_AXEgBy77PCRW8A1kZE--Uy1HQUI3L_Hx2QwEMZ3XkuLWdgUHBAw33-c8ZQAblepJ-2aOP_zMDyRmoGVHKGm-RxN6ffBt32urcBCQ6zkPu1Tbo9dMR_bB7X-ptcbB0UqL8jLMGL
West Red Lake Gold Mines (WRLG.v WRLGF) CEO Shane Williams highlighted the acquisition of the Madsen gold mine, with $350M in infrastructure, for just $6.5M. He emphasized extensive drilling, significant infrastructure upgrades, and an upcoming pre-feasibility study focused on an 800 t/day plan, with production targeted for 2025.
Gold prices reached an all-time high, rising 32% in 2024 due to factors such as geopolitical uncertainty in the Middle East, the U.S. presidential election, and expectations of lower Federal Reserve interest rates. Central bank purchases, particularly from China, have bolstered demand, with nations seeking to reduce reliance on the U.S. dollar. Although central bank buying slowed midyear, continued investor demand for gold as a safe-haven asset has been driven by global instability and confidence in further Fed rate cuts. (Soure: https://abcnews.go.com/Business/gold-prices-hitting-record-highs/story?id=114923101)
West Red Lake Gold (WRLG.v WRLGF) stands out as a compelling investment in the current gold market due to its combination of high-grade discoveries, a significant resource base, and near-term production potential at its flagship Madsen Mine which boasts robust NI 43-101 resources of 1.65 million ounces Indicated at 7.4 g/t Au and 0.37 million ounces Inferred at 6.3 g/t Au: https://www.reddit.com/r/Wealthsimple_Penny/comments/1h0py9l/interview_summary_west_red_lake_gold_mines_wrlgv/
West Red Lake Gold Mines (WRLG.v WRLGF) is advancing toward restarting the Madsen Gold Mine in Ontario's Red Lake District by mid-2025. With a PFS due early 2025 and recent high-grade drill results at the Upper 8 Target, WRLG is positioning the project for a strong return to gold production.
https://www.theglobeandmail.com/investing/markets/stocks/WRLG-X/pressreleases/29771387/
Following the definition of a new ore shoot at West Red Lake Gold's (WRLG.v WRLGF) Upper 8 Target, Guy Bennett from Global Stocks News did a deep dive into the significance of these results, noting the similarities to its high-grade 8 zone which boasts an Indicated resource of 87,700 oz @ 18 g/t Au.: https://www.theglobeandmail.com/investing/markets/markets-news/TheNewswire.com/29771387/structural-repetition-west-red-lake-golds-new-ore-shoot-is-similar-to-the-high-grade-8-zone/
Notably, the new shoot features intercepts like 44.17 g/t Au over 1.3m. As WRLG advances toward a 2025 restart of the Madsen Mine, a Pre-Feasibility Study is nearing completion with mine’s robust resources of 1.65 Moz Indicated @ 7.4 g/t Au and largely complete infrastructure making it a key asset: https://www.reddit.com/r/wallstreetsmallcaps/comments/1gwvm36/west_red_lake_gold_mines_wrlgv_wrlgf_progresses/
West Red Lake Gold Mines (WRLG.v WRLGF) CEO Shane Williams discusses their restart of the 2M-ounce Madsen Gold Project. With PFS completion expected in early 2025, the company targets initial production of 60-70k ounces/year starting in mid-2025, leveraging existing infrastructure and a systematic drilling approach.
Followers
|
13
|
Posters
|
|
Posts (Today)
|
0
|
Posts (Total)
|
533
|
Created
|
07/11/11
|
Type
|
Free
|
Moderators |
Volume | |
Day Range: | |
Bid Price | |
Ask Price | |
Last Trade Time: |