Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
https://skeenaresources.com/news/skeena-announces-multiple-21a-west-zone-expansions-at-eskay-creek-including-48.48-g-t-aueq-over-12.12-metres/
Skeena Announces Multiple 21A West Zone Expansions at Eskay Creek Including 48.48 g/t AuEq over 12.12 metres
Company Conference Call for Release of 2022 Eskay Creek Feasibility Study
The Company will be hosting a conference call at 8:00 AM PT/11:00 AM ET on Thursday, September 8th, 2022 after the release of the Eskay Creek Feasibility Study. A presentation by management will be followed by Q&A.
Webcast URL with Audio - https://services.choruscall.ca/links/skeenaresources202209feas.html
Participant Telephone Numbers - Canada/US 1-800-319-4610, International Toll +1-604-638-5340
August 2022
Eskay Creek Revitalization Project
https://skeenaresources.com/site/assets/files/5638/skeena_corporate_presentation_08_02_2022.pdf
Skeena Resources: Trading At A Deep Discount To Fair Value
https://seekingalpha.com/article/4528525-skeena-resources-trading-at-a-deep-discount-to-fair-value
A little bit of insider selling, but not enough to be concerned about IMHO.
I am back in. I cant believe with the assets that Skeena possesses that the share price is down here.
Getting close to my buy point. Skeena share price got out of control to the upside and is now coming down to earth. I like the company, but $12+ for a company at the stage of Skeena?
SKE seems to be holding up pretty well. I will wait to re-enter if it drops again. If not I will go elsewhere.
I am out again. Getting a little pricy for a non-producer. I will keep an eye on it and if it comes back down to earth I will buy again.
December 2021 Presentation https://skeenaresources.com/site/assets/files/5638/skeena_corporate_presentation_12_15_2021.pdf
SKREF changed to SKE. Moved to the NYSE from the OTC:
https://www.sec.gov/Archives/edgar/data/1713748/000110465921129037/tm2124138d2_40fr12ba.htm
https://otce.finra.org/otce/dailyList?viewType=Deletions
Skeena has done quite well for me and I still like the position.I am however going to take a break and watch from the sidelines for a while.
Skeena appoints experienced mine builder to board https://www.miningweekly.com/article/skeena-appoints-experienced-mine-builder-to-board-2021-10-05
Skeena Welcomes Randy Reichert to Board of Directors
Vancouver, BC (October 1, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena†or the “Companyâ€) is pleased to announce the appointment of Randy Reichert to the Board of Directors of the Company as an independent director. The Company also thanks Borden R. Putnam III as he moves from the Board of Directors to a technical advisor role for Skeena.
Skeena’s CEO, Walter Coles Jr. commented, “We are grateful to Borden for having been a Board member with Skeena for the last three years. He has been a valued contributor to the company’s overall success to date, and we are glad to be able to continue to benefit from his geological knowledge and expertise. Now, as we aggressively advance Eskay Creek through development and into production, Randy’s years of mine building experience will help guide Skeena in this exciting next stage of growth.â€
Mr. Reichert has 30 years of experience in the mining industry and is currently Vice President, Operations with B2Gold Corp. where he oversees their three international gold operations. Prior to this, Mr. Reichert was General Manager at their Fekola Mine in Mali where he was part of the development team and led the transition from development into operations.
Mr. Reichert started his career with Cominco in Canada working at various operations including the Snip Mine. He then embarked on international work with Bema Gold, Oriel Resources, and other junior companies in executive roles where he was responsible for various development projects and mining operations. Randy has led construction or development projects in Russia, Brazil, Nevada, and Kazakhstan and was General Manager during the development of the Kupol Mine in Russia with Bema Gold and subsequently Kinross. He also has experience as a consultant assisting with due diligence for mine financings for Canadian financial groups. Mr. Reichert has a BASc in Mining and Mineral Processing, an MScEng in Rock Mechanics, a Graduate Diploma in Business Administration and is a Professional Engineer.
Read at:
https://webmailb.netzero.net/webmail/new/5?session_redirect=true&userinfo=150fb40fa9758ba8704b913d0c3a1d36&count=1633092654&cf=sp&randid=1670012028
Yes, I have been seeing their great assays and the PFS.
Skeena Intersects 110.22 g/t Au over 4.41 metres at Snip Gold Project
Vancouver, BC (July 7, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to report diamond drill core results from the 2021 Phase 3 infill and exploration drilling program at the Snip gold project (“Snip” or the “Project”) located in the Golden Triangle of British Columbia. The Phase 3 program is designed to upgrade areas of existing Inferred resources from the Company’s 2020 Mineral Resource Estimate (MRE), to the Measured and Indicated categories. Reference images are presented at the end of this release as well as on the Company’s website.
Snip 2021 Phase 3 Drilling Highlights:
30.72 g/t Au over 3.82 m (S21-099)
48.44 g/t Au over 4.50 m (UG21-126)
33.63 g/t Au over 4.00 m (UG21-169)
25.64 g/t Au over 4.00 m (UG21-172)
58.47 g/t Au over 3.81 m (UG21-175)
46.94 g/t Au over 4.75 m (UG21-176)
110.22 g/t Au over 4.41 m (UG21-177)
True widths range from 60-100% of reported core lengths. Length weighted Au composites are constrained by geological considerations. Grade-capping of individual assays has not been applied to the Au assays informing the length-weighted Au composites. Samples below detection limit were nulled to a value of zero.
Read more at:
https://mailchi.mp/137ccfd3e811/skeena-intersects-11022-gt-au-over-441-metres-at-snip-gold-project?e=643847f53a
SKREF: effective June 10,2021 a one for 4 reverse split:
https://otce.finra.org/otce/dailyList?viewType=Symbol%2FName%20Changes
Looks promising for $SKREF
Skeena Announces Share Consolidation
Vancouver, BC (June 4, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to announce that, in anticipation of pursuing a listing on the New York Stock Exchange (the “NYSE”), the Company will consolidate its common shares at a ratio of four pre-consolidation shares to one post-consolidation share (the “Consolidation”). Fractional shares of 0.5 or greater will be rounded up to the nearest whole number of common shares and fractional shares of less than 0.5 will be rounded down to the nearest whole number of Shares.
Read more at:
https://mailchi.mp/6519ea7c7b0c/skeena-announces-share-consolidation?e=643847f53a
Skeena Discovers High Grade Mineralization in Former Eskay Creek Waste Facility Including 6.89 g/t AuEq over 22.80 metres
Vancouver, BC (May 25, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena†or the “Companyâ€) is pleased to report drilling results from the 2021 permitted Albino Waste Facility (“AWF†or “Albinoâ€) investigation at the Eskay Creek Project (“Eskay Creek†or the “Projectâ€) located in the Golden Triangle of British Columbia. This initial examination, totaling 190 m, was completed utilizing an air rotary drill rig from the ice surface of the AWF in March 2021. Analytical results from the first four of eight drill holes are presented in this release. The remaining holes will be released once analyses are available. Reference images are presented at the end of this release as well as on the Company’s website.
Eskay Creek AWF 2021 Highlights:
4.17 g/t Au, 160 g/t Ag (6.31 g/t AuEq) over 16.01 m (SK-21-841)
4.18 g/t Au, 190 g/t Ag (6.72 g/t AuEq) over 12.16 m (SK-21-842)
4.16 g/t Au, 204 g/t Ag (6.89 g/t AuEq) over 22.80 m (SK-21-843)
3.13 g/t Au, 127 g/t Ag (4.82 g/t AuEq) over 19.76 m (SK-21-844)
Historical Waste Facility Demonstrates Significant Grade and potential Situated west of the Eskay Creek mine site, the Albino Waste Facility was utilized by former operators as a subaqueous repository for mine waste management and included both mine waste rock as well as mill tailings.
Read more at:
https://mailchi.mp/5f6c53d10efc/skeena-discovers-high-grade-mineralization-in-former-eskay-creek-waste-facility-including-689-gt-aueq-over-2280-metres?e=643847f53a
They keep hitting good grades. This one may take a while, but it will get there.
Skeena Intersects 4.94 g/t AuEq over 8.20 metres at Eskay Creek in New Mineralized Corridor
Vancouver, BC (May 4, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to report diamond drill core results from the 2021 campaign of near mine exploration drilling at the Eskay Creek Project (“Eskay Creek” or the “Project”) located in the Golden Triangle of British Columbia. The exploratory program was focused on testing both in-pit and near mine targets and totaled 4,375 m across twenty surface-based drill holes. Reference images are presented at the end of this release as well as on the Company’s website.
Eskay Creek 2021 Drilling Highlights:
1.01 g/t Au, 6 g/t Ag (1.09 g/t AuEq) over 9.46 m (SK-21-703)
1.92 g/t Au, 25 g/t Ag (2.25 g/t AuEq) over 7.50 m (SK-21-810)
1.54 g/t Au, 27 g/t Ag (1.90 g/t AuEq) over 13.70 m (SK-21-821)
1.54 g/t Au, 10 g/t Ag (1.68 g/t AuEq) over 15.68 m (SK-21-824)
2.22 g/t Au, 9 g/t Ag (2.33 g/t AuEq) over 15.20 m (SK-21-824)
1.17 g/t Au, 6 g/t Ag (1.25 g/t AuEq) over 19.70 m (SK-21-824)
1.31 g/t Au, 14 g/t Ag (1.50 g/t AuEq) over 33.00 m (SK-21-824)
1.08 g/t Au, 10 g/t Ag (1.22 g/t AuEq) over 16.56 m (SK-21-829)
3.99 g/t Au, 71 g/t Ag (4.94 g/t AuEq) over 8.20 m (SK-21-838)
Mineralization Discovered in “The Gap Zone”
Situated in an essentially undrilled corridor measuring 300 m by 75 m between the 21A and 21B Zones, 2021 drill holes SK-21-821 and SK-21-838 have established the existence of additional Contact Mudstone hosted mineralization having intersected 1.54 g/t Au, 27 g/t Ag (1.90 g/t AuEq) over 13.70 m and 3.99 g/t Au, 71 g/t Ag (4.94 g/t AuEq) over 8.20 m, respectively. Although the Contact Mudstones demonstrate very predictable geological continuity from the historically mined 21B Zone south towards the 21A Zone across this largely undrilled “gap”, the lack of sufficient drill density precluded the incorporation of mineralization in this area into the Company’s 2021 Mineral Resource Estimate (MRE).
Read more & view tables & graphics at:
https://mailchi.mp/4a4fa06ef133/skeena-intersects-494-gt-aueq-over-820-metres-at-eskay-creek-in-new-mineralized-corridor?e=643847f53a
Skeena Intersects 45.76 g/t Au over 5.60 metres at Snip Gold Project
Vancouver, BC (April 27, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena†or the “Companyâ€) is pleased to report diamond drill core results from the 2020-2021 campaign of exploration drilling at the Snip gold project (“Snip†or the “Projectâ€) located in the Golden Triangle of British Columbia. The exploratory program was focused upon resource expansion and delineating additional mineralization in previously unexplored areas of the near mine environment. The surface-based program was comprised of ten drill holes totaling 5,366 metres. Reference images are presented at the end of this release as well as on the Company’s website.
Snip Drilling Highlights:
45.40 g/t Au over 0.50 m (S20-047)
45.76 g/t Au over 5.60 m (S20-049)
29.52 g/t Au over 4.03 m (S20-049)
37.78 g/t Au over 2.86 m (S20-049)
Read & view graphics & tables at:
https://mailchi.mp/e84bb634bfb5/skeena-intersects-4576-gt-au-over-560-metres-at-snip-gold-project?e=643847f53a
I was not expecting that news until May. Good news though.
Skeena Announces 5.3 Moz at 4.3 g/t AuEq Measured and Indicated Resources at Eskay Creek
Vancouver, BC (April 7, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena†or the “Companyâ€) is pleased to announce an updated Mineral Resource Estimate (“MRE"), for the Eskay Creek gold-silver project (“Eskay Creekâ€), located in the Golden Triangle of British Columbia, which has been reviewed and validated by SRK Consulting (Canada) Inc (“SRKâ€). The 2021 MRE was derived from 7,583 historical surface and underground diamond drill holes totalling 651,332 metres, with an additional 751 surface diamond drill holes completed by Skeena between 2018-2021 totalling 104,740 metres. The effective date of this MRE is April 7, 2021 and an updated technical report will be filed on the Company’s website and SEDAR within 45 calendar days of this disclosure. Reference images are presented at the end of this release as well as on the Company’s website.
Read much more & view extensive tables and graphics at:
https://mailchi.mp/dfb1dfd9ca86/skeena-announces-53-moz-at-43-gt-aueq-measured-and-indicated-resources-at-eskay-creek?e=643847f53a
Well, so this is Day 1 (of MY learning of their existence).....
Just seeing the word Skeena means that they're in my backyard (or rather just what, about 700 miles north of me ?)
And they're
Into the development of the past-producing Eskay Creek !?
Into the development of the legendary Eskay Creek !?
But yikes the gold sounds like it's 600 meters deep !?
If so that seems like a lot of over-burden
Market cap's up in the 662million Canadian range ?
Reckon it's got that size mkt cap due to A) Nice-sounding gold grades and B) In part it's great History ?
Whatever, I see that its' chart looks like this (first thing I noticed was the Horizontal and then fact that it's only 1yr old and THEN the (potential) H&S).....
That volume appears to confirm The Key Juncture Theory !
Naturally, Barrick's at a Crucial Juncture as well.....
Perhaps could use SKE (and what / whom else ?) to determine the odds of what Barrick might do
Sector-wide
Weekends were made for research, that's all......Don't mind me
All feedback welcome - what else should I know ?
That maybe the Dollar will Clonk-Out at 93 making the golds sector NOT DROP but Climb ? ?
QuestEx Gold & Copper Announces Non-brokered Private Placement of up to $8.136M Including Strategic Investment by Skeena Resources
https://www.juniorminingnetwork.com/junior-miner-news/press-releases/944-tsx-venture/qex/95863-questex-announces-non-brokered-private-placement-of-up-to-8-136m-including-strategic-investment-by-skeena-resources.html
I plan to accumulate a nice position within the next 45 days.
Yes a good story. I liked the story a couple of years ago when they were talking about all of the gold left behind decades ago when the infrastructure was zip. Now they are proving out the fact that with the infrastructure problems solved and rising gold prices it is a winner.
I am sorry I only have a small position.
I cant believe there is not more activity on this board. This looks to be a great company.
I really like the DD I have done on this company. Not invested yet, but I will be soon.
Skeena Intersects 12.51 g/t AuEq over 19.15 metres in 21C Zone Infill Drilling at Eskay Creek
Vancouver, BC (March 2, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to report the last diamond drill core results from the Phase 2 campaign of definition and exploration drilling at the Eskay Creek Project (“Eskay Creek” or the “Project”) located in the Golden Triangle of British Columbia. The Phase 2 infill program, focused upon resource category conversions for the Pre-Feasibility Study (“PFS”) on open-pit constrained resources, is now complete. This release presents the last of the Phase 2 results. The Company has also recently completed a 5,000 m near-mine exploration program at Eskay Creek with results expected shortly. Reference images are presented at the end of this release as well as on the Company’s website.
Eskay Creek Infill Drilling Highlights:
21C Zone:
• 3.35 g/t Au, 9 g/t Ag (3.47 g/t AuEq) over 33.93 m (SK-21-677)
• 7.10 g/t Au, 406 g/t Ag (12.51 g/t AuEq) over 19.15 m (SK-21-678)
• 2.82 g/t Au, 57 g/t Ag (3.58 g/t AuEq) over 49.00 m (SK-21-679)
• 5.45 g/t Au, 12 g/t Ag (5.61 g/t AuEq) over 26.80 m (SK-21-702)
• 3.99 g/t Au, 14 g/t Ag (4.17 g/t AuEq) over 41.92 m (SK-21-815)
• 3.97 g/t Au, 13 g/t Ag (4.15 g/t AuEq) over 28.00 m (SK-21-816)
HW Zone:
• 6.06 g/t Au, 11 g/t Ag (6.21 g/t AuEq) over 16.40 m (SK-21-805)
• 3.20 g/t Au, 11 g/t Ag (3.34 g/t AuEq) over 32.19 m (SK-21-806)
Read & view graphics at:
https://mailchi.mp/7163902d19ce/skeena-intersects-1251-gt-aueq-over-1915-metres-in-21c-zone-infill-drilling-at-eskay-creek?e=643847f53a
Skeena Discovers New In-Pit Mineralization at
Eskay Creek Including 4.80 g/t AuEq over 30.50 metres
Vancouver, BC (February 17, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to report additional diamond drill core results from the Phase 2 campaign of definition and exploration drilling at the Eskay Creek Project (“Eskay Creek” or the “Project”) located in the Golden Triangle of British Columbia. The Phase 2 infill program, focused upon resource category conversions for the Pre-Feasibility Study (“PFS”) on open-pit constrained resources, is now complete. The Company has also recently completed a 5,000 m near-mine exploration program at Eskay Creek and is awaiting results. Reference images are presented at the end of this release as well as on the Company’s website.
Eskay Creek Infill Drilling Highlights
New 21C-HW Zone:
• 4.33 g/t Au, 13 g/t Ag (4.50 g/t AuEq) over 20.05 m (SK-20-692)
• 4.65 g/t Au, 11 g/t Ag (4.80 g/t AuEq) over 30.50 m (SK-20-780)
21C Zone:
• 3.87 g/t Au, 7 g/t Ag (3.96 g/t AuEq) over 24.70 m (SK-20-721)
• 2.69 g/t Au, 30 g/t Ag (3.09 g/t AuEq) over 33.92 m (SK-20-735)
• 3.20 g/t Au, 83 g/t Ag (4.31 g/t AuEq) over 29.35 m (SK-20-748)
21E Zone:
• 3.34 g/t Au, 160 g/t Ag (5.48 g/t AuEq) over 24.50 m (SK-20-742)
• 5.68 g/t Au, 38 g/t Ag (6.18 g/t AuEq) over 28.02 m (SK-20-752)
• 4.11 g/t Au, 164 g/t Ag (6.30 g/t AuEq) over 28.09 m (SK-20-757)
• 3.85 g/t Au, 53 g/t Ag (4.55 g/t AuEq) over 26.10 m (SK-20-759)
• 2.49 g/t Au, 213 g/t Ag (5.34 g/t AuEq) over 25.50 m (SK-20-763)
• 3.14 g/t Au, 114 g/t Ag (4.65 g/t AuEq) over 40.89 m (SK-20-764)
21B, HW Zones:
• 3.92 g/t Au, 26 g/t Ag (4.27 g/t AuEq) over 25.00 m (SK-20-754)
• 5.35 g/t Au, 113 g/t Ag (6.86 g/t AuEq) over 15.50 m (SK-20-773)
New In-Pit Mineralization Discovered Above the 21C Zone
Situated within the open-pit contemplated by the Company’s 2019 Preliminary Economic Assessment, a previously unrecognized zone of mineralization has been discovered above the 21C Zone. Examples of this recently drilled mineralization (21C-HW Zone) include 4.65 g/t Au, 11 g/t Ag (4.80 g/t AuEq) over 30.50 m (SK-20-780), 4.33 g/t Au, 13 g/t Ag (4.50 g/t AuEq) over 20.05 m (SK-20-692), and 1.39 g/t Au, 8 g/t Ag (1.49 g/t AuEq) over 29.25 m (and SK-20-698).
Read moreand view graphics & drill tables at:
https://mailchi.mp/a5147c2e3978/skeena-discovers-new-in-pit-mineralization-at-eskay-creek-including-480-gt-aueq-over-3050-metres?e=643847f53a
Skeena Intersects 13.86 g/t AuEq over 25.27 metres in Hanging Wall Zone at Eskay Creek
Vancouver, BC (February 10, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to report additional diamond drill core results from the Phase 2 campaign of definition and exploration drilling at the Eskay Creek Project (“Eskay Creek” or the “Project”) located in the Golden Triangle of British Columbia. The Phase 2 infill program, focused upon resource category conversions for the Pre-Feasibility Study (“PFS”) on open-pit constrained resources, is now complete. The Company has also recently completed a 5,000 m near-mine exploration program at Eskay Creek and is awaiting results. Reference images are presented at the end of this release as well as on the Company’s website.
Eskay Creek Infill Drilling Highlights:
Hanging Wall (HW) Zone
• 11.56 g/t Au, 173 g/t Ag (13.86 g/t AuEq) over 25.27 m (SK-20-716)
o Including:123.50 g/t Au, 1,920 g/t Ag (149.10 g/t AuEq) over 0.50 m
o And: 85.70 g/t Au, 1,150 g/t Ag (101.03 g/t AuEq) over 2.12 m
21B Zone
• 15.30 g/t Au, 80 g/t Ag (16.37 g/t AuEq) over 14.00 m (SK-20-709)
21C Zone
• 4.41 g/t Au, 5 g/t Ag (4.48 g/t AuEq) over 22.50 m (SK-20-680)
• 3.20 g/t Au, 242 g/t Ag (6.42 g/t AuEq) over 19.00 m (SK-20-699)
o Including: 41.60 g/t Au, 4,390 g/t Ag (100.13 g/t AuEq) over 1.00 m
Read more & View graphics at:
https://mailchi.mp/af0634783b80/skeena-intersects-1386-gt-aueq-over-2527-metres-in-hanging-wall-zone-at-eskay-creek?e=643847f53a
Skeena Intersects Thick Intercepts Grading 5.67 g/t AuEq over 71.85 m and 9.15 g/t AuEq over 25.50 m within 21C Zone Development Buffer at Eskay Creek
Vancouver, BC (January 28, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena†or the “Companyâ€) is pleased to report additional diamond drill core results from the Phase 2 campaign of definition and exploration drilling at the Eskay Creek Project (“Eskay Creek†or the “Projectâ€) located in the Golden Triangle of British Columbia. The Phase 2 infill program focused upon resource category conversions for the Pre-Feasibility Study (“PFSâ€) on open-pit constrained resources, is now complete. Six drill rigs are currently active at the Project finalizing a 5,000 m near-mine exploration program. Reference images are presented at the end of this release as well as on the Company’s website.
Eskay Creek Infill Drilling Highlights - 21B and 21C Zones
22.23 g/t Au, 1,605 g/t Ag (43.63 g/t AuEq) over 2.79 m (SK-20-589)
20.92 g/t Au, 258 g/t Ag (24.36 g/t AuEq) over 6.45 m (SK-20-591)
8.50 g/t Au, 182 g/t Ag (10.92 g/t AuEq) over 10.75 m (SK-20-596)
23.13 g/t Au, 613 g/t Ag (31.30 g/t AuEq) over 4.10 m (SK-20-598)
2.52 g/t Au, 92 g/t Ag (3.75 g/t AuEq) over 27.22 m (SK-20-607)
5.74 g/t Au, 247 g/t Ag (9.04 g/t AuEq) over 12.75 m (SK-20-623)
5.38 g/t Au, 22 g/t Ag (5.67 g/t AuEq) over 71.85 m (SK-20-626)
8.82 g/t Au, 25 g/t Ag (9.15 g/t AuEq) over 25.50 m (SK-20-627)
Read & view drill tables and graphics at:
https://mailchi.mp/8fa1dcd62a37/skeena-intersects-thick-intercepts-grading-567-gt-aueq-over-7185-m-and-915-gt-aueq-over-2550-m-within-21c-zone-development-buffer-at-eskay-creek?e=643847f53a
Skeena Completes Positive Metallurgical Testwork Program in Support of Upcoming PFS for Eskay Creek
NR: 21-03
Vancouver, BC (January 26, 2021) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (“Skeena†or the “Companyâ€) is pleased to present key findings from recently completed metallurgical testwork in support of the upcoming Pre-Feasibility Study (“PFSâ€) for the Company’s Eskay Creek Project (“Eskay Creek†or the “Projectâ€) located in the Golden Triangle of British Columbia. This latest campaign of testwork produced a modified plant flowsheet which resulted in improved results over the flowsheet included in the Eskay Creek Preliminary Economic Assessment (“PEAâ€). The PEA study report entitled “NI 43-101 Technical Report on Preliminary Economic Assessment†was filed on SEDAR by Skeena on December 20, 2019 and can be found on the Company’s website.
Highlights
- An extensive metallurgical testing program was conducted on fresh core samples from the 21A, 21B, 21C, 21E and HW Zones as well as samples included in the previous PEA testwork
- The process flowsheet now includes a desliming stage to improve flotation response for coarser material, resulting in the option of producing a higher gold concentrate grade and opportunities to reduce capital costs
- The testwork results further de-risks the Eskay Creek metallurgy and improves confidence in the process plant design for the upcoming PFS
Read more at:
https://mailchi.mp/250bc1fef69c/skeena-completes-positive-metallurgical-testwork-program-in-support-of-upcoming-pfs-for-eskay-creek?e=643847f53a
Volume | |
Day Range: | |
Bid Price | |
Ask Price | |
Last Trade Time: |