Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Well I am a little early talking about this one, I am still trying to gather a position.. but with winter coming on I do not see much action around here.. most do not look at the long term but that is where the real wealth is made.
Follow the market cap rather than the share price, my buy orders are all in below the bid and I would like to get about 250k shares down here over the next month.
Yes these are long term holds, and I am getting stoked on a tidbit (rumor) that there may be a megafactory just outside Montreal within a year or two.
This is large flake lithium which demands a higher sale price, so a one year hold should be a 10 bagga at least, if the company moves forward and is not another mining company that just drags out the drill holes for years.
No you're not. I am listening, watching, and contemplating. Might be a good long play with thoughtful DD. Appreciate your knowledge.
How much longer will VIRT/OTCX continue to short? A$K rising?
Looks like I took out the entire daily volume with today's buy
what a gift
Bought 125,000 $0.0367 Settles 11/02/2022 9:30 AM 10/31/2022
Looks like I took out the entire volume with today's buy
what a gift
from Aug 2022 you tube video, this will give an overview of the enormity of this discovery
Time will be the enemy here, most mining plays take 5 years to go to production, however because this is at surface and an open pit scenario it could be fast tracked within 2 years (my guess only)
Only 69m outstanding?
This can easily get to $3-4/share. IMO
Researching more into it.
Experts warn that supply of a key component in electric vehicles is hurtling towards a tipping point when global demand will outstrip supply — a moment that could come as early as this year.
Graphite is one of the primary components that make up the anodes in a lithium ion battery, yet the state of its supply has gone largely unnoticed for years, even as demand for battery-grade minerals continues to rise with electric vehicle sales reaching record levels.
“Graphite has kind of been the poor cousin of the battery minerals and doesn’t get the attention of the other commodities,” said Gregory Bowes, executive chairman of the Northern Graphite Corporation. “But we’re getting very close to an inflection point where demand overtakes supply and this is going to be first page news.”
https://www.supplychaindive.com/news/graphite-shortage-ev-electric-vehicles-supply-chain/626870/
Berkwood Graphite Project (previously named Lac Gueret South Property), Quebec (continued)
A 2% NSR is payable to the optionors on all minerals produced from the property. The Company has the right at any time to buy-back 2% of the NSR from the optionors for $1,000,000. During the year ended February 28, 2018, the Company expanded its Lac Gueret Extensions project (South & East blocks).
The Company acquired more claims adjacent to and on-trend with Mason Graphite. The Company paid $25,000 and issued 62,500 common shares of the Company fair valued at $56,250.
Tesla is expanding the hiring of recruiters and a support team for a “high-volume” hiring effort in Quebec amid rumors of a potential factory coming to the region.
Earlier this year, we started reporting on evidence that Tesla has been looking at a potential location in Canada for its next Gigafactory.
Tesla plans to ramp up production to 20 million electric vehicles by the end of the decade, and it is expected to need about eight more Gigafactories to do it.
In June, Electrek obtained a recording of a companywide meeting held by Tesla CEO Elon Musk, during which he confirmed that Tesla is looking at sites in North America, and the CEO hinted at Canada for Tesla’s next Gigafactory, which he says should be announced by the end of the year.
Musk did it again at Tesla’s annual shareholders’ meeting last month, and the effort was confirmed through a lobbying disclosure by the automaker with the Ontario government in Canada.
Later, a local report stated that Tesla had visited Vale’s nickel operations in Canada and was scouting sites for a factory in Ontario and Quebec.
We also reported that Tesla visited a graphite mining and processing company based in Quebec’s battery valley.
The biggest evidence that Tesla was looking to establish a factory in Canada, and more specifically in Quebec, came in the form of a job posting for a “high volume recruiter” in Quebec.
It was significant since Tesla has used similar language about “high volume” recruiting ahead of other big factory projects, like Gigafactory Berlin in Germany.
That was back in September and we have heard much since, but now Tesla has posted another interesting job posting.
Electrek found a new job posting for a ‘Recruiting Coordinator’ based in Laval, Quebec, which is just outside of Montreal. In the job posting, Tesla writes that the coordinator will “work closely with high-volume Recruiters”:
Work closely with high-volume Recruiters in a fast-paced organization. We see our candidates as our guests, and we are their hosts. Act as a guide for candidates through the onboarding process ensuring a smooth candidate experience.
The job posting makes it sound like Tesla is preparing to recruit and onboard a high volume of new employees in Quebec.
Musk has said that Tesla is looking to announce the location of Tesla’s next Gigafactory by the end of the year.
Electrek’s Take
Being from Quebec, I admit that I am biased in wanting Tesla to invest in a facility in Quebec. So please take that into account in my reporting.
With that said, I think that it starting to look very good for Quebec to get a Tesla factory.
Net value of proven deposit $1,744,200,000. current market cap $2,640,189 10/26/2022
READ IT!!!
https://greenbatteryminerals.com/wp-content/uploads/ReportFINAL_compressed.pdf
The mineral resource estimate yields an Indicated Resource of 1.76 Mt at 17.00% Cgr and Inferred Resource of 1.53 Mt at 16.4% Cgr. The pit constrained resource sensitivity remains robust even in reducing significantly the assumed commodity price (US$ 1,140 per tonne graphite, or CDN$ 1,530 per tonne)
Mt= million tons
The Zone 1 deposit lies 8 km southwest of Mason Graphite’s deposit which is the subject of a current feasibility study. The Company believes its Zone 1 deposit and that of Mason share many similar geological characteristics with the Zone 1 deposit being one of the highest-grade graphite deposits in the world.
This is mine number 6 that this company has discovered and brought to production.
https://greenbatteryminerals.com/
current market cap 2.425,370
fair value 24,000,000 (my estimate)
proven reserves several billion!!!
When this gets discovered it will fly
Market Cap 2,425,370 10/25/2022
then read this 67 page report on SEDAR
https://www.sedar.com/DisplayProfile.do?lang=EN&issuerType=03&issuerNo=00004797
GREEN BATTERY MINERALS INC.
Management’s Discussion and Analysis
For the period Ended August 31, 2022
GBMIF Amazing Share Structure
Market Cap Market Cap 2,321,426 10/17/2022
Authorized Shares Unlimited 09/30/2022
Outstanding Shares 69,296,287 09/30/2022
Held at DTC 2,367,330 09/30/2022
Float 64,756,287 02/28/2022
GBMIF Short Selling Data
Short Interest
59,687 (226.48%) 09/30/2022
https://www.otcmarkets.com/stock/GBMIF/security
Protagonists OTCX/ VIRT are going to get crushed!
$GBMIF Took a starter position here under .03. The upside looks amazing!
And only a 2 million market cap with 1.7 million tons verified in an open pit situation..
Summary of Zone 6 significant graphite enrichment intercepts.
HOLE-ID FROM (m) TO (m) LENGTH LITHOLOGY
(m)
BK6-22-13 30.43 33.55 3.12 massive graphite enrichment
BK6-22-14 54.66 57.41 2.75 massive graphite enrichment
BK6-22-17 44.36 47.9 3.54 massive graphite enrichment
BK6-22-17 53.14 61.73 8.59 massive graphite enrichment
BK6-22-19 58.9 61.13 2.23 massive graphite enrichment
BK6-22-21 35.65 52.15 16.5 massive graphite enrichment
BK6-22-22 16.1 17.7 1.6 massive graphite enrichment
The above intervals are drilling lengths, not true widths, because the true orientation of the enrichment horizons has not yet been established.
The 2022 drilling focused on the outcrops 1 to 3 along the southern limb, and outcrop 4 at the ‘fold nose’ area. Intersections in holes 32 and 13 successfully extended the westward strike of graphite enrichment by approximately 100 m – open to the west. Intersections in holes 14, 15, 17, 16, 20, and 18, extended the enriched horizon to the east connecting it with the Outcrop 3 area, where the thickest intersection were encountered in hole 21. Additional intersections in the neighboring holes 22, and 24 appear to show local folding and replication of the enriched horizon within the antiform which hosts the graphite enriched horizon.
The results from the drilling show a complex fold interference pattern across the zone 6 area. The diamond drilling program was completed with oriented core allowing the collection important structural data to aid in interpretation of the spatial extent and controls on the enrichment horizon. Interpretations are currently underway to better understand the fold geometry at the zone 6 area, and to understand controls on localized replication of the enrichment horizon as identified at the outcrop 3 area.
lets see what a two year hold does with this one
bought 280,000 @ .0288,
Unfortunately those parameters do not work for young pink and otc companies, they are driven by events rather than Nasdaq technical indicators, they can change in either direction in an instant.
It is a combination of market cap, share structure and future potential which should be the guiding factors.
This company has a market cap of 2 million with a proven 1.7 million tons of graphite which sells for $1170 per ton. that is your equation.
The company retains a Market Volatility (i.e., Beta) of -0.3811, which attests to possible diversification benefits within a given portfolio. Green Battery Minerals exposes twenty-seven different technical indicators, which can help you to evaluate its performance.[url][/url][tag]https://www.macroaxis.com/performance/GBMIF/Green-Battery-Minerals[/tag]
This will be an open pit mine, the easiest and cheapest way to mine, and it is medium to large flake graphite
And I am talking to myself
took a starter position here, will see how it trades but right now it is an unknown.. average daily volume has been 12,050, my buy this morning just blew that number out of whack
First thoughts...
A graphite mineral company with a 2 million market cap and the mineral resource at Lac Gueret South Project includes in-pit constrained resource totaling 1,755,300 tonnes of indicated resources at 17.00 % Cgr and 1,526,400 tonnes in inferred resources at 16.39 % Cgr
I can leave my brain at home for this one!
News 10/06/2022 (highlight)
A total of 20 exploratory drill holes were completed for a total of 2,058m. Seven of the twenty holes intersected significant graphite enrichment contiguous with previous drill results, extending the initial strike length of the Graphite enrichment horizon to 350 m along the southern limb.
Highlights intersections from initial assay results:
BK6-22-21 intersected 16.5 m of graphite enrichment from 35.7 m to 52.2 m for a total of 16 samples submitted, (See figure 2 below).
BK6-22-17 intersected 3.5 m of graphite enrichment from 44.4 m to 47.9 m, and 8.6 m of graphite enrichment from 53.1 m to 61.7 m for a total of 12 samples submitted.
BK6-21-24 with 2.8 m graphite enrichment from 64.5 m to 67.3 m for a total of 3 samples submitted.
NI 43-101 Highlights
The objective of the recent drilling was to generate the initial mineral resources estimate based on the 45 drillholes drilled between August 2017 and December 2018. The estimate has been prepared by GoldMinds Geoservices under the supervision of Claude Duplessis, ing (OIQ)
The mineral resource at Lac Gueret South Project includes in-pit constrained resource totalling 1,755,300 tonnes of indicated resources at 17.00 % Cgr and 1,526,400 tonnes in inferred resources at 16.39 % Cg
Share Structure (as of 10/10/2022)
Market Cap 2,065,029 10/07/2022
Authorized Shares Unlimited 09/30/2022
Outstanding Shares 69,296,287 09/30/2022
Held at DTC 2,367,330 09/30/2022
Float 64,756,287 02/28/2022
Followers
|
4
|
Posters
|
|
Posts (Today)
|
0
|
Posts (Total)
|
113
|
Created
|
10/10/22
|
Type
|
Free
|
Moderators |
GreenBattery Projects are located within the exploration friendly jurisdiction of Quebec, in the Manicouagan Regional County Municipality, three hours driving time from the city of Baie-Comeau. Easy access is provided via a major secondary road and numerous tertiary and forest roads that traverse the property.
Volume | |
Day Range: | |
Bid Price | |
Ask Price | |
Last Trade Time: |