Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
W2P - Millions Killed For Profit - Covid Was State Sponsored Genocide - Dr. David Martin To EU Parliament
MOTHER CURES SON'S VACCINATION POISON INDUCED AUTISM! [26.06.2023]
WATCH
https://www.bitchute.com/video/j2pqMhJLQPnu/
Yeah! Go Trump Amen
Prayers Thanks Trump: 'We'll Demolish The Deep State, Expel the War Mongers, Drive Out the Globalists, Cast Out ...
https://rumble.com/v2wl6zq-trump-well-demolish-the-deep-state-expel-the-war-mongers-drive-out-the-glob.html
Trump Hardens Position on Abortion | Trump Rails Against Indictment| Donald Trump Speech Today
W2P - Trump Hardens Position on Abortion | Trump Rails Against Indictment| Donald Trump Speech Today
Thank You NYBob Premium Gold Amen
GO TRUMP - BREAKING NEWS & SITUATION REPORT 6/26: DEREK JOHNSON TALKS TRIBUNALS,
(CLONES OR MASKS?) & THE EBS!
WATCH
https://www.bitchute.com/video/DBIYfT3PrNOc/
xxxx xxxx
Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.
Selinsing Flotation Plant
Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.
Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.
With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.
As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.
Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.
Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.
Post by nozzpackon Jun 24, 2023
RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -
Figure 3: Selinsing Flotation Plant
So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month
We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments
Figure 2. Concentrate Shipment at Weighbridge
2023-06-23 12:22 ET - News Release
Ms. Cathy Zhai reports
MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE
Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.
President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.
The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."
Gold concentrate shipments and sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.
To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate are currently available for sale.
The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.
In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.
Commercial production update
The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.
Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.
Mining update
Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023
Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023
https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/
View PDF
Vancouver, B.C., June 23, 2023,
Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.
President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”
Figure 1. Loading Concentrate for Transport
Figure 2. Concentrate Shipment at Weighbridge
Gold Concentrate Shipments and Sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.
Commercial Production Update
The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.
Figure 3: Selinsing Flotation Plant
Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.
Mining Update
Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.
The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.
About Monument
Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.
Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6
FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:
Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com
New development to increase production from our Floatation Plant ....
With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:
....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.
.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.
This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).
In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.
I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .
We are in good hands,,
There is a lot going on on the Monument Mining website very interesting explanation
nozzpack thanks
https://monumentmining.com/projects/selinsing-gold-portfolio/development/
https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/
https://monumentmining.com/
https://monumentmining.com/investors/presentation/
https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf
https://monumentmining.com/news-media/photo-gallery/
Comment on this Post
God Bless
Amen
Bullish
Berit Brunback <bbrun_2@yahoo.com>
To:
Berit
Sun, Jun 25 at 1:15 p.m.
More than 10,000 illegal immigrants are crossing the U.S. border each day -
Exactly go Trump! Amen
LIVE: President Trump Keynote Speech at Oakland County Republican Party Lincoln Day Dinner 6/25/23
That is a lot of people. I would most likely do the same if I was welcomed with free food, housing, and schooling amongst other benefits.
W2P - More than 10,000 illegal immigrants are crossing the U.S. border each day -
Our futures are bright in Jesus!
Great Ron DeSantis has just endorsed President Trump for President 2024
https://rumble.com/v2wb0vh-another-endorsement-for-45.html
World Freedom Directory
FIND A FREEDOM ORGANIZATION NEAR YOU
https://stopworldcontrol.com/map/?inf_contact_key=1d9fa0fd7d1fd994df0de27f34eb5af8d18a532c4142cb79caf2b269de1401fa
https://www.freedomwatchusa.org/time-criminals-of-the-year
https://www.freedomwatchusa.org/
https://www.freedomwatchusa.org/hillary-clinton-sued-for-alleged-wrongful-death-defamation
CAPTURED ON VIDEO - DEWS DIRECTED ENERGY WEAPONS IN ACTION
WATCH
https://www.bitchute.com/video/PltvmwHphy6B/
Cancer is Exploding because of CV19 Vax – Dr. Betsy Eads
By Greg Hunter On June 24, 2023 In Weekly News
https://usawatchdog.com/cancer-is-exploding-because-of-cv19-vax-dr-betsy-eads/
GEOENGINEERING WATCH GLOBAL ALERT NEWS, JUNE 24, 2023, #411 ( DANE WIGINGTON )
WATCH
ttps://www.bitchute.com/video/36AuAAaZFoCP/
xxxx xxxx
Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.
Selinsing Flotation Plant
Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.
Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.
With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.
As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.
Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.
Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.
Post by nozzpackon Jun 24, 2023
RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -
Figure 3: Selinsing Flotation Plant
So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month
We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments
Figure 2. Concentrate Shipment at Weighbridge
2023-06-23 12:22 ET - News Release
Ms. Cathy Zhai reports
MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE
Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.
President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.
The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."
Gold concentrate shipments and sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.
To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate are currently available for sale.
The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.
In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.
Commercial production update
The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.
Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.
Mining update
Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023
Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023
https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/
View PDF
Vancouver, B.C., June 23, 2023,
Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.
President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”
Figure 1. Loading Concentrate for Transport
Figure 2. Concentrate Shipment at Weighbridge
Gold Concentrate Shipments and Sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.
Commercial Production Update
The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.
Figure 3: Selinsing Flotation Plant
Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.
Mining Update
Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.
The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.
About Monument
Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.
Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6
FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:
Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com
New development to increase production from our Floatation Plant ....
With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:
....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.
.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.
This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).
In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.
I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .
We are in good hands,,
There is a lot going on on the Monument Mining website very interesting explanation
nozzpack thanks
https://monumentmining.com/projects/selinsing-gold-portfolio/development/
https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/
https://monumentmining.com/
https://monumentmining.com/investors/presentation/
https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf
https://monumentmining.com/news-media/photo-gallery/
Comment on this Post
God Bless
Amen
Bullish
CAPTURED ON VIDEO - DEWS DIRECTED ENERGY WEAPONS IN ACTION
WATCH
https://www.bitchute.com/video/PltvmwHphy6B/
Cancer is Exploding because of CV19 Vax – Dr. Betsy Eads
By Greg Hunter On June 24, 2023 In Weekly News
https://usawatchdog.com/cancer-is-exploding-because-of-cv19-vax-dr-betsy-eads/
GEOENGINEERING WATCH GLOBAL ALERT NEWS, JUNE 24, 2023, #411 ( DANE WIGINGTON )
WATCH
ttps://www.bitchute.com/video/36AuAAaZFoCP/
xxxx xxxx
Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.
Selinsing Flotation Plant
Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.
Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.
With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.
As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.
Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.
Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.
Post by nozzpackon Jun 24, 2023
RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -
Figure 3: Selinsing Flotation Plant
So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month
We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments
Figure 2. Concentrate Shipment at Weighbridge
2023-06-23 12:22 ET - News Release
Ms. Cathy Zhai reports
MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE
Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.
President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.
The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."
Gold concentrate shipments and sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.
To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate are currently available for sale.
The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.
In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.
Commercial production update
The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.
Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.
Mining update
Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023
Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023
https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/
View PDF
Vancouver, B.C., June 23, 2023,
Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.
President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”
Figure 1. Loading Concentrate for Transport
Figure 2. Concentrate Shipment at Weighbridge
Gold Concentrate Shipments and Sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.
Commercial Production Update
The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.
Figure 3: Selinsing Flotation Plant
Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.
Mining Update
Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.
The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.
About Monument
Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.
Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6
FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:
Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com
New development to increase production from our Floatation Plant ....
With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:
....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.
.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.
This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).
In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.
I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .
We are in good hands,,
There is a lot going on on the Monument Mining website very interesting explanation
nozzpack thanks
https://monumentmining.com/projects/selinsing-gold-portfolio/development/
https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/
https://monumentmining.com/
https://monumentmining.com/investors/presentation/
https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf
https://monumentmining.com/news-media/photo-gallery/
Comment on this Post
God Bless
Amen
Bullish
The Truth! We Need It DJT Amen
God Bless NYBob and everyone reading this
Prayers Thanks - Cancer is Exploding because of CV19 Vax – Dr. Betsy Eads
By Greg Hunter On June 24, 2023 In Weekly News
https://usawatchdog.com/cancer-is-exploding-because-of-cv19-vax-dr-betsy-eads/
GEOENGINEERING WATCH GLOBAL ALERT NEWS, JUNE 24, 2023, #411 ( DANE WIGINGTON )
WATCH
ttps://www.bitchute.com/video/36AuAAaZFoCP/
xxxx xxxx
Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.
Selinsing Flotation Plant
Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.
Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.
With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.
As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.
Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.
Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.
Post by nozzpackon Jun 24, 2023
RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -
Figure 3: Selinsing Flotation Plant
So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month
We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments
Figure 2. Concentrate Shipment at Weighbridge
2023-06-23 12:22 ET - News Release
Ms. Cathy Zhai reports
MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE
Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.
President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.
The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."
Gold concentrate shipments and sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.
To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate are currently available for sale.
The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.
In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.
Commercial production update
The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.
Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.
Mining update
Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023
Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023
https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/
View PDF
Vancouver, B.C., June 23, 2023,
Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.
President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”
Figure 1. Loading Concentrate for Transport
Figure 2. Concentrate Shipment at Weighbridge
Gold Concentrate Shipments and Sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.
Commercial Production Update
The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.
Figure 3: Selinsing Flotation Plant
Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.
Mining Update
Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.
The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.
About Monument
Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.
Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6
FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:
Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com
New development to increase production from our Floatation Plant ....
With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:
....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.
.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.
This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).
In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.
I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .
We are in good hands,,
There is a lot going on on the Monument Mining website very interesting explanation
nozzpack thanks
https://monumentmining.com/projects/selinsing-gold-portfolio/development/
https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/
https://monumentmining.com/
https://monumentmining.com/investors/presentation/
https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf
https://monumentmining.com/news-media/photo-gallery/
Comment on this Post
God Bless
Amen
Bullish
W2P Thank You - GEOENGINEERING WATCH GLOBAL ALERT NEWS, JUNE 24, 2023, #411 ( DANE WIGINGTON )
WATCH
ttps://www.bitchute.com/video/36AuAAaZFoCP/
xxxx xxxx
Watch Monument Mining Ltd $MMY $MMTMF - Production of 6000 ounces for Q4…this quarter
Feed grade is now on target at 1.98 gms per ton.
Selinsing Flotation Plant
Recovery should be around 85% which was achieved on some days in June when forecast grades of
newly mined transition and fresh ore were processed.
Flotation recovery has shown a steady improvement in June although an average of 68-per-cent
recovery month to date was caused by some poorly performing old transition ore processed at the
start of the month.
With two weeks remaining in June as of the operational date of this report, we have an excellent
chance to reach 6000 ounces, with 5000 ounces in the bag.
As of this report progress report, it looks like we should hit full stride in early July including much
higher recoveries to forecast normal levels ,due to higher feed grades from freshly mined ore.
Is so, we should hit forecast productiin of about 15000+ ounces in Q1 of F24 which begins July 1 of
2023...........4500 tons of concentrate per month @ 1.2 ounces per ton times 3 months = 16200
ounces generating close to $35 million cad in revenues.
Fair value market cap in the $200 million range which is about $0.60 per share which assumes that the
150,000 ounces of Inferred sulphides will be converted to economic ore.....an almost certain bet.
Post by nozzpackon Jun 24, 2023
RE: Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
News..Close to Being Fully Commissioned ..60000 Ounces -
Figure 3: Selinsing Flotation Plant
So, 5000 tons of Concentrate averaging 1.2 ounces per ton = 6000 ounces are now being delivered
as part of the offtake agreement ......about $13 milion in USD .
99 % breast plate in June./month
We shall soon be at planned 4500 tons per month containing 1.2 ounces = 5400 ounces===which is
over 60,000 ounces per years
Monument Mining begins Au concentrate shipments
Figure 2. Concentrate Shipment at Weighbridge
2023-06-23 12:22 ET - News Release
Ms. Cathy Zhai reports
MONUMENT BEGINS GOLD CONCENTRATE SHIPMENTS AT SELINSING GOLD MINE
Monument Mining Ltd. has begun the first gold concentrate shipments and sales from the newly
constructed flotation plant at the Selinsing gold mine.
President and chief executive officer Cathy Zhai commented: "This is a momentous occasion for us as
we begin to ship and sell gold concentrates from the flotation plant.
The initial offtake of 2,000 dry metric tonnes (DMT) of concentrate from Selinsing marks the beginning
of a gold concentrate revenue stream and restores our operating cash flow.
We would like to give thanks to our hard-working operation teams, backroom administration support
personnel and our business partners to make this happen."
Gold concentrate shipments and sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate.
All export and transport permits have been received and the first truckloads of concentrate were shipped from the Selinsing warehouse on June 18, 2023, to Johor Free Trade Zone.
To date 490 DMT of concentrate have been dispatched out of an initial offtake of 2,000 DMT.
Weighing, sampling and moisture determination of the delivered concentrate are being conducted at the Johor Free Trade Zone by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate are currently available for sale.
The company intends after a trial shipment to gradually increase the number of trucks to speed up the logistic process in selling backlogged product.
In the future concentrates will be shipped to buyers on a routine basis. The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits and organizing logistics. Over the past six months, the company has built a logistic team and sales chain at the Selinsing project.
Commercial production update
The flotation plant operation is improving with up to 99 per cent of design capacity achieved during June, 2023, and overall 83-per-cent capacity achieved for the 30-day period up to June 17, 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier McLanahan. New HDPE (high-density polyethylene) pipework was received to upgrade the concentrate thickener underflow pipeline. A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a bottleneck with increasing flotation mass pull.
Flotation recovery has shown a steady improvement as increasing proportions of newly mined transition and fresh ore were processed. Daily recoveries in excess of 80 per cent have been recorded during June, 2023, although an average of 68-per-cent recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50 per cent done. Work continued extending the lean-to roof to the filter press building. The bagging system has been prepared for shipping to Malaysia.
Mining update
Mining of Buffalo Reef stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore delivered to the ROM pad and maintained around one month supply of ore feed to the flotation processing plant. A new drill rig was delivered in June, 2023, with nine grade control drilling rigs now operational; a 10th unit is scheduled for delivery in August, 2023. The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive's depot progressed well with delivery of the bulk emulsion gassing container and the connection to mains power completed. This is to remove dependency on explosives delivery from the sole dominant supplier in the country due to its shortfall of trucks over the past several months. The isotainer storage tanks are due for delivery in late June, 2023, and the explosives depot will be commissioned in early July, 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility capable of processing up to 700 grade control samples per day, which will remove another major bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation to improve the performance.
by nozzpackon Jun 23, 2023
Monument Begins Gold Concentrate Shipments at Selinsing Gold Mine
June 23, 2023
https://monumentmining.com/news-media/news/2023/monument-begins-gold-concentrate-shipments-at-selinsing-gold-mine/
View PDF
Vancouver, B.C., June 23, 2023,
Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (“Monument” or the “Company”) is
pleased to announce the first gold concentrate shipments and sales from the newly constructed
flotation plant at the Selinsing Gold Mine.
President and CEO Cathy Zhai commented, “This is a momentous occasion for us as we begin to ship
and sell gold concentrates from the flotation plant. The initial offtake of 2,000 dry metric tonnes
(“DMT”) of concentrate from Selinsing marks the beginning of a gold concentrate revenue stream and
restores our operating cash flow. We would like to give thanks to our hard-working operation teams,
backroom administration support personnel and our business partners to make this happen.”
Figure 1. Loading Concentrate for Transport
Figure 2. Concentrate Shipment at Weighbridge
Gold Concentrate Shipments and Sales
Significant interest has been received from potential buyers of the Selinsing gold concentrate. All
export and transport permits have been received and the first truckloads of concentrate were shipped
from the Selinsing warehouse on June 18th, 2023 to Johor Free Trade Zone. To date 490 DMT of
concentrate have been dispatched out of an initial offtake of 2,000 DMT. Weighing, sampling and
moisture determination of the delivered concentrate is being conducted at the Johor Free Trade Zone
by an appointed internationally recognized survey company.
An additional 3,000 DMT of concentrate is currently available for sale.
The Company intends after a trial shipment to gradually increase the number of trucks to speed up
the logistic process in selling backlogged product. In the future concentrates will be shipped to buyers
on a routine basis.
The backlog was caused by a lengthy initial administrative process for obtaining all relevant permits
and organizing logistics.
Over the last six months, the Company has built a logistic team and sales chain at the Selinsing
Project.
Commercial Production Update
The flotation plant operation is improving with up to 99% of design capacity achieved during June
2023, and overall 83% capacity achieved for the 30 day period up to June 17th 2023.
Torn filter cloths remained an issue with new cloths still awaited from the filter press supplier
McLanahan. New HDPE pipework was received to upgrade the concentrate thickener underflow
pipeline.
A similar upgrade was planned for the flotation cleaner concentrate pipeline which emerged as a
bottleneck with increasing flotation mass pull.
Figure 3: Selinsing Flotation Plant
Flotation recovery has shown a steady improvement as increasing proportions of newly mined
transition and fresh ore were processed. Daily recoveries in excess of 80% have been recorded
during June 2023, although an average of 68% recovery month to date was caused by some poorly performing old transition ore processed at the start of the month.
Construction of the concentrate shed continued with the main roof completed and the perimeter concrete wall approximately 50% done. Work continued extending the lean-to roof to the filter press
building. The bagging system has been prepared for shipping to Malaysia.
Mining Update
Mining of Buffalo Reef Stage 1 BRC2 and BRC3 pits continued with both transition and fresh ore
delivered to the ROM pad and maintained around one month’s supply of ore feed to the flotation
processing plant.
A new drill rig was delivered in June 2023 with nine grade control drilling rigs now operational; a tenth
unit is scheduled for delivery in August 2023.
The mining operation is aiming to achieve and maintain a three-month supply of ore at the ROM.
Construction of the explosive’s depot progressed well with delivery of the bulk emulsion gassing
container and the connection to mains power completed. This is to remove dependency on explosives
delivery from the sole dominant supplier in the country due to their shortfall of trucks over the past
several months.
The isotainer storage tanks are due for delivery in late June 2023 and the explosives depot will be
commissioned in early July 2023.
Work started on the conversion of the old core shed to an expanded sample preparation facility
capable of processing up to 700 grade control samples per day, which will remove another major
bottleneck in the mining cycle.
Risks
Other operation risks in related to mining and processing processes are under continuous evaluation
to improve the performance.
The Company closely monitors uncontrollable risk factors with building and operation of the flotation
plant including but not limited to: change of market conditions, change of gold prices, operation risks
including critical parts shortages which may cause a longer than expected ramp up period, and
changes in regulatory restrictions in relation to arsenic level contained in gold concentrate.
About Monument
Monument Mining Limited (TSX-V: MMY, FSE: D7Q1) is an established Canadian gold producer that
100% owns and operates the Selinsing Gold Mine in Malaysia and the Murchison Gold Project in the
Murchison area of Western Australia.
It has 20% interest in Tuckanarra Gold Project jointly owned with Odyssey Gold Ltd in the same
region.
The Company employs approximately 200 people in both regions and is committed to the highest
standards of environmental management, social responsibility, and health and safety for its
employees and neighboring communities.
Cathy Zhai, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6
FOR FURTHER INFORMATION visit the company web site at
https://www.monumentmining.com
or contact:
Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102
rcushing@monumentmining.com
New development to increase production from our Floatation Plant ....
With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:
....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.
.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.
This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).
In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.
I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .
We are in good hands,,
There is a lot going on on the Monument Mining website very interesting explanation
nozzpack thanks
https://monumentmining.com/projects/selinsing-gold-portfolio/development/
https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/
https://monumentmining.com/
https://monumentmining.com/investors/presentation/
https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf
https://monumentmining.com/news-media/photo-gallery/
Comment on this Post
God Bless
Amen
Bullish
Love to all! Can anyone help $ now? Hurting for some money... Please always pray... Thanks!
CASH APP: $Bigfootbud
ZELLE: gkaye2@cox.net
Hey everyone! I thinking of selling my house but be able to live in it up to 5 years.
Hopefully rent-free... but $500.00/Month would be acceptable...
I will take some of the sale money and fix it up for whoever buys it!
Some online sites value my home around $240,000.00 or so...
It has amazing sweeping views S/W to N/W... (White Tank Mtns & Estrella Mtns)
I would be willing to take $200,000.00 OR BEST OFFER and spend maybe $30,000.00 fixing it up.
I have an offer for $140,000.00 and stay for up to 5 years paying $1300.00/Month but that's not good enough deal!
I would like to have the option to buy it back at any time during the 5 years, and pay 5% above what you buy it for, in order to give a little profit for helping me out...
The sale would help me finally get out of debt completely, and get doing some other things to make even more money...
Anyone interested?? Thanks for any interest! :)
Lord Bless all no matter what! :)
Sign Me Up DJT Amen
TRUMP ‘THIS IS THE FINAL BATTLE FOR AMERICA’ AND WE ALL NEED TO GET INVOLVED!
WATCH
https://www.bitchute.com/video/Ju9yUbD6d6Y0/
Trust AGENDA47: PROTECTING AMERICANS BY TAKING ON BIG PHARMA AND ENDING GLOBAL
FREELOADING
WATCH
https://www.bitchute.com/video/PojvE8pQLn3p/
Look At What They Are Dumping To Buy Dips In Gold, Plus More Inflation Is On The Way
June 22, 2023
https://kingworldnews.com/look-at-what-they-are-dumping-to-buy-dips-in-gold-plus-more-inflation-is-on-the-way/
New development to increase production from our Floatation Plant ....
With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:
....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.
.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.
This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).
In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.
I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .
We are in good hands,,
There is a lot going on on the Monument Mining website very interesting explanation
nozzpack thanks
https://monumentmining.com/projects/selinsing-gold-portfolio/development/
https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/
https://monumentmining.com/
https://monumentmining.com/investors/presentation/
https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf
https://monumentmining.com/news-media/photo-gallery/
Comment on this Post
God Bless
Amen
Bullish
Trust AGENDA47: PROTECTING AMERICANS BY TAKING ON BIG PHARMA AND ENDING GLOBAL
FREELOADING
WATCH
https://www.bitchute.com/video/PojvE8pQLn3p/
Look At What They Are Dumping To Buy Dips In Gold, Plus More Inflation Is On The Way
June 22, 2023
https://kingworldnews.com/look-at-what-they-are-dumping-to-buy-dips-in-gold-plus-more-inflation-is-on-the-way/
New development to increase production from our Floatation Plant ....
With respect to the construction of the Biox Plant and in order to reduce the initial capital investment,
the Company now plans to develop the Selinsing Sulphide Project through a two stage de-risking
process:
....Stage 1 construction of a flotation plant that was originally designed to deliver sulphide gold
concentrates as a semi product for further BIOX® leaching process.
.....Under the new approach, the flotation plant will be modified to produce higher grade saleable gold
concentrates, the cash generated from which may be used to fund upgrading of the BIOX® leaching
plant.
This is an excellent move to modify the FP to produce a higher grade gold concentrate .
This will maximize and front load our profitability, both from increased production volumes and higher
grade concentrate relative to head grade
( ie higher recovery rates ).
In other words, Mass pull will be enhanced which will result in a concentrate weighing less but
containing more gold.
I would say that Dato is once again exercising his substantial background in mining experience around
the world and introducing those efficiency activities to make Selinsing as profitable as possible .
We are in good hands,,
There is a lot going on on the Monument Mining website very interesting explanation
nozzpack thanks
https://monumentmining.com/projects/selinsing-gold-portfolio/development/
https://monumentmining.com/projects/selinsing-gold-portfolio/exploration/
https://monumentmining.com/
https://monumentmining.com/investors/presentation/
https://monumentmining.com/site/assets/files/4327/2023-03-02-cp-mmy.pdf
https://monumentmining.com/news-media/photo-gallery/
Comment on this Post
God Bless
Amen
Bullish
Amen! God Bless USA Trump!
Amen! God Bless USA Trump
DONALD TRUMP WILL BE PRESIDENT AGAIN SOON!!! IT WILL BE GLORIOUS!!! WATCH FATHER GOD MOVE!!!
WATCH
https://www.bitchute.com/channel/ZMrKMJXzlNmq/
TRUMP HAS THE CONSTITUTIONAL AUTHORITY TO USE IMPOUNDMENT TO REMOVE THE GLOBALISTS
WATCH
https://www.bitchute.com/channel/mceUxXUAGJvw/
ALBERTA PREMIER DANIELLE SMITH SLAMS TRUDEAU LIBERALS FOR WANTING TO "SHUT DOWN OUR ENERGY INDUSTRY"
WATCH
https://www.bitchute.com/video/OOccJdvUcDc/
GREAT RESET: THE DOLLAR IS DONE! - INFLATION SKYROCKETS AS BRICS TAKES OVER!
WATCH
https://www.bitchute.com/video/cJMGjcIpddSg/
HUGE: VACCINES KILL HUNDREDS OF THOUSANDS A WEEK! - GOVERNMENT REPORTS
PROVE GENOCIDE!
WATCH
https://www.bitchute.com/video/u43RrVbeR78u/
Everyone that took a PCR test is probably screwed -
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=172177272
https://twitter.com/i/status/1671165388372205
Great Reset or Great Awakening – Bo Polny
By Greg Hunter On June 20, 2023 In Political Analysis 3 Comments
https://usawatchdog.com/great-reset-or-great-awakening-bo-polny/
By Forced New Passports & more? - Will We Be Forced To Take Bio-Jab & Booster Jabs To Ex.
Get A New Drivers License Every So Often To We Be Killed & Murdered By The Bio-Jabs Killers???
Prayers Needed - TRUMP HAS THE CONSTITUTIONAL AUTHORITY TO USE IMPOUNDMENT TO REMOVE THE GLOBALISTS -
WATCH
https://www.bitchute.com/channel/mceUxXUAGJvw/
ALBERTA PREMIER DANIELLE SMITH SLAMS TRUDEAU LIBERALS FOR WANTING TO "SHUT DOWN OUR ENERGY INDUSTRY"
WATCH
https://www.bitchute.com/video/OOccJdvUcDc/
GREAT RESET: THE DOLLAR IS DONE! - INFLATION SKYROCKETS AS BRICS TAKES OVER!
WATCH
https://www.bitchute.com/video/cJMGjcIpddSg/
HUGE: VACCINES KILL HUNDREDS OF THOUSANDS A WEEK! - GOVERNMENT REPORTS
PROVE GENOCIDE!
WATCH
https://www.bitchute.com/video/u43RrVbeR78u/
Everyone that took a PCR test is probably screwed -
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=172177272
https://twitter.com/i/status/1671165388372205
Great Reset or Great Awakening – Bo Polny
By Greg Hunter On June 20, 2023 In Political Analysis 3 Comments
https://usawatchdog.com/great-reset-or-great-awakening-bo-polny/
By Forced New Passports & more? - Will We Be Forced To Take Bio-Jab & Booster Jabs To Ex.
Get A New Drivers License Every So Often To We Be Killed & Murdered By The Bio-Jabs Killers???
Go! Go! Go! DJT & The Great Reset Premium Silver and GOLD $MMY $MMTMF Amen
GREAT ALBERTA PREMIER DANIELLE SMITH SLAMS TRUDEAU LIBERALS FOR WANTING TO "SHUT DOWN OUR ENERGY INDUSTRY"
WATCH
https://www.bitchute.com/video/OOccJdvUcDc/
lggy_Bot Thanks - GREAT RESET: THE DOLLAR IS DONE! - INFLATION SKYROCKETS AS BRICS TAKES OVER!
WATCH
https://www.bitchute.com/video/cJMGjcIpddSg/
HUGE: VACCINES KILL HUNDREDS OF THOUSANDS A WEEK! - GOVERNMENT REPORTS
PROVE GENOCIDE!
WATCH
https://www.bitchute.com/video/u43RrVbeR78u/
Everyone that took a PCR test is probably screwed -
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=172177272
https://twitter.com/i/status/1671165388372205
Great Reset or Great Awakening – Bo Polny
By Greg Hunter On June 20, 2023 In Political Analysis 3 Comments
https://usawatchdog.com/great-reset-or-great-awakening-bo-polny/
By Forced New Passports & more? - Will We Be Forced To Take Bio-Jab & Booster Jabs To Ex.
Get A New Drivers License Every So Often To We Be Killed & Murdered By The Bio-Jabs Killers???
The Great Reset! DJT Premium Silver and GOLD! God Bless & Amen
Jesus Prayers Thanks - GREAT RESET: THE DOLLAR IS DONE! - INFLATION SKYROCKETS AS BRICS TAKES OVER!
WATCH
https://www.bitchute.com/video/cJMGjcIpddSg/
HUGE: VACCINES KILL HUNDREDS OF THOUSANDS A WEEK! - GOVERNMENT REPORTS
PROVE GENOCIDE!
WATCH
https://www.bitchute.com/video/u43RrVbeR78u/
Everyone that took a PCR test is probably screwed -
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=172177272
https://twitter.com/i/status/1671165388372205
Great Reset or Great Awakening – Bo Polny
By Greg Hunter On June 20, 2023 In Political Analysis 3 Comments
https://usawatchdog.com/great-reset-or-great-awakening-bo-polny/
By Forced New Passports & more? - Will We Be Forced To Take Bio-Jab & Booster Jabs To Ex.
Get A New Drivers License Every So Often To We Be Killed & Murdered By The Bio-Jabs Killers???
Gosh! I’m Humbled and Praying DJT Amen
Prayers Thanks - HUGE: VACCINES KILL HUNDREDS OF THOUSANDS A WEEK! - GOVERNMENT REPORTS
PROVE GENOCIDE!
WATCH
https://www.bitchute.com/video/u43RrVbeR78u/
Everyone that took a PCR test is probably screwed -
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=172177272
https://twitter.com/i/status/1671165388372205
Great Reset or Great Awakening – Bo Polny
By Greg Hunter On June 20, 2023 In Political Analysis 3 Comments
https://usawatchdog.com/great-reset-or-great-awakening-bo-polny/
By Forced New Passports & more? - Will We Be Forced To Take Bio-Jab & Booster Jabs To Ex.
Get A New Drivers License Every So Often To We Be Killed & Murdered By The Bio-Jabs Killers???
Woohoo! Go DJT Premium Gold & Silver! Amen
W2P Thanks - Everyone that took a PCR test is probably screwed -
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=172177272
https://twitter.com/i/status/1671165388372205
Great Reset or Great Awakening – Bo Polny
By Greg Hunter On June 20, 2023 In Political Analysis 3 Comments
https://usawatchdog.com/great-reset-or-great-awakening-bo-polny/
By Forced New Passports & more? - Will We Be Forced To Take Bio-Jab & Booster Jabs To Ex.
Get A New Drivers License Every So Often To We Be Killed & Murdered By The Bio-Jabs Killers???
Prayers Thanks - Great Reset or Great Awakening – Bo Polny
By Greg Hunter On June 20, 2023 In Political Analysis 3 Comments
https://usawatchdog.com/great-reset-or-great-awakening-bo-polny/
By Forced New Passports & more? - Will We Be Forced To Take Bio-Jab & Booster Jabs To Ex.
Get A New Drivers License Every So Often To We Be Killed & Murdered By The Bio-Jabs Killers???
We are made righteous in Jesus
First seek the kingdom of God
BIO-JAB VACCINATED BECOME WEAPONIZED SUPER SPREADERS ~ JOE BIDEN COVID DEATH JAB
TURNING PEOPLE INTO ZOMBIES BY AID & HIV -
WATCH
https://www.bitchute.com/video/p3lHRr1tvGtY/
By Forced New Passports & more -
Wow! Ready! DJT Amen
KICK1 Thanks - BLINKEN OKS CHINA TAKEOVER OF TAIWAN!!!, 4123
WATCH
https://www.bitchute.com/video/vdhw5dxdZzLT/
WHY TRUMP’S INDICTMENT IS A FRAUD!!!, 4121
WATCH
https://www.bitchute.com/video/Ex5f5kvymDYP/
Alberta Premier Smith Tells Trudeau To F**K OFF On Oil And Gas!
Prayers Great - WHY TRUMP’S INDICTMENT IS A FRAUD!!!, 4121
WATCH
https://www.bitchute.com/video/Ex5f5kvymDYP/
Alberta Premier Smith Tells Trudeau To F**K OFF On Oil And Gas!
Let’s Go Team Trump! Amen
Watch Trump Breaking News 6.19.2023
https://rumble.com/v2v5u0c-trump-breaking-news-6.19.2023.html
KICK1 Thanks - Proof Canada Fires INTENTIONAL by Gov’t Arsonists! Plus mRNA & Baby Deformities Bombshell!
https://rumble.com/v2ug3x4-proof-canada-fires-intentional-by-govt-arsonists-plus-mrna-and-baby-deformi.html
Top Canadian politician apologizes to unvaccinated, “we were wrong…” she makes unprecedented promise…
June 17, 2023 ( ago)
Danielle Smith, the current premier of Alberta in Canada, has done something remarkable. She took the bold and unprecedented step of apologizing to unvaccinated Canadians who’ve faced unfair treatment from the government throughout the “pandemic.” But Ms. Smith actually went beyond just issuing an apology, Danielle actually made a promise: anyone who was terminated from their job due to their refusal of the COVID-19 vaccine will be reinstated.
Wow. That’s not the type of humility you hear from politicians everyday, is it?
Comedian and conservative podcaster Jimmy Dore was actually blown away by this apology and covered it at length.
Yes they were! HaHa this is too funny
KICK1 - Proof Canada Fires INTENTIONAL by Gov’t Arsonists! Plus mRNA & Baby Deformities Bombshell!
https://rumble.com/v2ug3x4-proof-canada-fires-intentional-by-govt-arsonists-plus-mrna-and-baby-deformi.html
Top Canadian politician apologizes to unvaccinated, “we were wrong…” she makes unprecedented promise…
June 17, 2023 ( ago)
Danielle Smith, the current premier of Alberta in Canada, has done something remarkable. She took the bold and unprecedented step of apologizing to unvaccinated Canadians who’ve faced unfair treatment from the government throughout the “pandemic.” But Ms. Smith actually went beyond just issuing an apology, Danielle actually made a promise: anyone who was terminated from their job due to their refusal of the COVID-19 vaccine will be reinstated.
Wow. That’s not the type of humility you hear from politicians everyday, is it?
Comedian and conservative podcaster Jimmy Dore was actually blown away by this apology and covered it at length.
Followers
|
237
|
Posters
|
|
Posts (Today)
|
2
|
Posts (Total)
|
18767
|
Created
|
07/15/07
|
Type
|
Free
|
Moderator Welcome2Pinkyland | |||
Assistants |
Prayer changes things!
We encourage you to submit any prayer needs, big or small. Please know that your requests are prayed over by people who love to pray on the behalf of others.
Also - The Board is open for any civil discussion re: Christianity
___________________________________________________________________________________________________________________________
Note- If you would like to be banned from posting on this board, it's not hard, all you will need to do is one of the following:
-use curse words
-call others names
-post in a tuanting manner
___________________________________________________________________________________________________________________________
The Authorized King James Version is an English translation of the Christian Bible begun in 1604 and first published in 1611 by the Church of England.
The title page to the 1611 first edition of the Authorized Version Bible by Cornelius Boel shows the Apostles Peter and Paul seated centrally at the top. Moses and Aaron flank the central text. In the four corners sit Matthew, Mark, Luke and John, authors of the four gospels, with their symbolic animals. The rest of the Apostles stand at the top.
Please Join Us Every Night As We Read From The King James Bible.
MATTHEW 18:20 For where two or three are gathered together in my name, there am I in the midst of them.
_______________________________________________________________________________________________________________________________________________________________________
Prayer is Effective
"This is the confidence we have in approaching God: that if we ask anything according to his will, he hears us. And if we know that he hears us - whatever we ask - we know that we have what we asked of him" (1 John 5:14-15).
"Do not be anxious about anything, but in everything, by prayer and petition, with thanksgiving, present your requests to God. And the peace of God, which transcends all understanding, will guard your hearts and your minds in Christ Jesus" (Philippians 4:6-7).
"…The prayer of a righteous man is powerful and effective" (James 5:16).
"And pray in the Spirit on all occasions with all kinds of prayers and requests. With this in mind, be alert and always keep on praying for all the saints" (Ephesians 6:18).
"In the same way, the Spirit helps us in our weakness. We do not know what we ought to pray for, but the Spirit himself intercedes for us with groans that words cannot express" (Romans 8:26).
"If we confess our sins, he is faithful and just and will forgive us our sins and purify us from all unrighteousness" (1 John 1:9).
"Be joyful always; pray continually; give thanks in all circumstances, for this is God's will for you in Christ Jesus" (1 Thessalonians 5:16-18).
"When you ask, you do not receive, because you ask with wrong motives, that you may spend what you get on your pleasures" (James 4:3).
The Teachings of Jesus
"And when you pray, do not be like the hypocrites, for they love to pray standing in the synagogues and on the street corners to be seen by men. I tell you the truth, they have received their reward in full. But when you pray, go into your room, close the door and pray to your Father, who is unseen. Then your Father, who sees what is done in secret, will reward you. And when you pray, do not keep on babbling like pagans, for they think they will be heard because of their many words. Do not be like them, for your Father knows what you need before you ask him" (Matthew 6:5-8).
"To some who were confident of their own righteousness and looked down on everybody else, Jesus told this parable: 'Two men went up to the temple to pray, one a Pharisee and the other a tax collector. The Pharisee stood up and prayed about himself: "God, I thank you that I am not like other men-robbers, evildoers, adulterers-or even like this tax collector. I fast twice a week and give a tenth of all I get." But the tax collector stood at a distance. He would not even look up to heaven, but beat his breast and said, "God, have mercy on me, a sinner. I tell you that this man, rather than the other, went home justified before God. For everyone who exalts himself will be humbled, and he who humbles himself will be exalted"'" (Luke 18:9-14).
"'Have faith in God,' Jesus answered. 'I tell you the truth, if anyone says to this mountain, "Go, throw yourself into the sea," and does not doubt in his heart but believes that what he says will happen, it will be done for him. Therefore I tell you, whatever you ask for in prayer, believe that you have received it, and it will be yours. And when you stand praying, if you hold anything against anyone, forgive him, so that your Father in heaven may forgive you your sins'" (Mark 11:22-25).
"And I will do whatever you ask in my name, so that the Son may bring glory to the Father. You may ask me for anything in my name, and I will do it" (John 14:13-14).
posted by-NYBob:
http://investorshub.advfn.com/boards/read_msg.asp?message_id=21256239
Prayer is conversation with Father God -
when a Christian shuts out the world around
and concentrates on the spiritual.
The Catholic Church describes prayer as
"raising one's mind and heart to God".
The Church of England describes it as
"offering ourselves to be in some small way -
channels of love and peace in God's world".
posted by -vantillian :
http://investorshub.advfn.com/boards/read_msg.asp?message_id=21368357
"Evening, and morning, and at noon, will I pray, and cry aloud, and He shall hear me." Psalm 55:17
"Jesus answered. Therefore I tell you, whatever you ask for in prayer, believe that you will receive it, and it will be yours." Mark 11:22, 24
"If any of you should ask me for an epitome of the Christian religion, I should say that it is in one word - prayer. Live and die without prayer, and you will pray long enough when you get to hell." Charles Spurgeon
"Prayer will make a man cease from sin, or sin will entice a man to cease from prayer." John Bunyan
"Prayer is the acid test of devotion." Samuel Chadwick
"The spirit of prayer is more precious than treasures of gold and silver." John Bunyan
"...a man who kneels before God will stand before men." Leonard Ravenhill
"he that is never on his knees on earth, shall never stand upon his feet in heaven." C. H. Spurgeon
"If weak in prayer, we are weak everywhere." - Leonard Ravenhill
"Prayer does not fit us for the greater work, prayer is the greater work." Oswald Chambers
"In prayer it is better to have a heart without words than words without a heart." John Bunyan
"The greatest and best talent that God gives to any man or woman in this world is the talent of prayer." Alexander Whyte
"A sinning man stops praying, a praying man stops sinning." Leonard Ravenhill
"He who runs from God in the morning will scarcely find Him the rest of the day." John Bunyan
"If your faith does not make you pray, have nothing to do with it: get rid of it, and God help thee to begin again." C. H. Spurgeon
"I live in the spirit of prayer; I pray as I walk, when I lie down and when I rise, and the answers are always coming." George Mueller
"Prayer is not so much an act as it is an attitude-an attitude of dependency, dependency upon God." Arthur W. Pink
"Notice, we never pray for folks we gossip about, and we never gossip about the folk for whom we pray! For prayer is a great deterrent." Leonard Ravenhill
"No man - I don't care how colossal his intellect - No man is greater than his prayer life." - Leonard Ravenhill
"Pray often, for prayer is a shield to the soul, a sacrifice to God. and a scourge for Satan." John Bunyan
"We have to pray with our eyes on God, not on the difficulties." Oswald Chambers
"Prayer is the spiritual gymnasium in which we exercise and practice Godliness." VL Crawford
"You can do more than pray after you've prayed, but you cannot do more than pray until you have prayed." John Bunyan
"He who knows how to overcome with God in prayer has heaven and earth at his disposal." C. S. Spurgeon
"A holy life does not live in the closet, but it cannot live without the closet." E. M. Bounds
"In souls filled with love, the desire to please God is continual prayer." John Wesley
"The more helpless you are, the better you are fitted to pray, and the more answers to prayer you will experience." O. Hallesby
"I am as certain as I am standing here, that the secret of much mischief to our own souls, and to the souls of others, lies in the way that we stint, and starve, and scamp our prayers, by hurrying over them." Alexander Whyte
"Of all the duties enjoined by Christianity none is more essential and yet more neglected than prayer." - Fenelon
"He who is too busy to pray will be too busy to live a holy life. Satan had rather we let the grass grow on the path to our prayer chamber than anything else." E.M.Bounds
"Learn to worship God as the God who does wonders, who wishes to prove in you that He can do something supernatural and divine." Andrew Murray
"Those who know God the best are the richest and most powerful in prayer. Little acquaintance with God, and strangeness and coldness to Him, make prayer a rare and feeble thing." E. M. Bounds
"True prayer is measured by weight,-not by length. A single groan before God may have more fullness of prayer in it than a fine oration of great length." C. H. Spurgeon
"Prayer is not a hard requirement- it is the natural duty of a creature to its creator, the simplest homage that human need can pay to divine liberality." C. H. Spurgeon
"The greatest thing anyone can do for God and man is pray. It is not the only thing; but it is the chief thing. The great people of the earth today are the people who pray. I do not mean those who talk about prayer; nor those who say they believe in prayer; nor yet those who can explain about prayer; but I mean those people who take time to pray." S.D. Gordon
Volume | |
Day Range: | |
Bid Price | |
Ask Price | |
Last Trade Time: |