Monday, July 23, 2012 6:45:07 PM
Bin feed system replaces ton bag system that was used. they can now feed the beast at max capacity
No fouling self cleaning kiln
compressor system redesigned (by john) cost 2K now instead of 50K 2psi instead of 1000psi (safety)
Towers are amazingly better than old ones, redesigned
Self cleaning auto petcoke removal is next on johns list to finish design, when that happens continuous run times will be more that the 75% max that is current
The beat the crap out of processor #1 testing it over and over at more than max specs and it finally gave up. they are fixing it and it will be back online soon
They got emission even better with new design which makes permitting in other states easy. the first rock ten site got an exemption because of this. Saves time
He noted that the solid waste permit App is 2-3" thick and has to go to local buffalo office then to Albany and pass though a shit load of gov't people that's why it takes so long. Anyone who has dealt with the New York state gov't can appreciate the BS
Last Shot Hydration Drink Announced as Official Sponsor of Red River Athletic Conference • EQLB • Jun 20, 2024 2:38 PM
ATWEC Announces Major Acquisition and Lays Out Strategic Growth Plans • ATWT • Jun 20, 2024 7:09 AM
North Bay Resources Announces Composite Assays of 0.53 and 0.44 Troy Ounces per Ton Gold in Trenches B + C at Fran Gold, British Columbia • NBRI • Jun 18, 2024 9:18 AM
VAYK Assembling New Management Team for $64 Billion Domestic Market • VAYK • Jun 18, 2024 9:00 AM
Fifty 1 Labs, Inc Announces Acquisition of Drago Knives, LLC • CAFI • Jun 18, 2024 8:45 AM
Hydromer Announces Attainment of ISO 13485 Certification • HYDI • Jun 17, 2024 9:22 AM