EXCERPT; Mesotech sonar was used to sweep the platform location. Divers removed all identified potential obstructions and prepared the tie-in point for connection to the pipeline.
"Engineers then connected the 10-inch flow line from the well to the main transmission line, about 500 feet from the wellhead, which brings the oil and gas ashore. The on-shore facility that will receive the oil and gas is the Six Pigs Facility on Padre Island," explained Worthington Energy, Inc. President and CEO, Mr. Tony Mason.