They must do construction slow where your at, at the hospital we gutted and fully renovated (chillers, boilers, walls, the entire package) a 250k sq ft 7 story building in 12 months, permits, 80% and 100% inspections until Certificate of occupancy was obtained.
Construction permits have been place part of the deal, and 1 month this will be up and running. We are not talking about a house or mansion. A grow facility with state of the art equipment. I also was in construction . U