InvestorsHub Logo

LongRun8

01/02/14 10:51 PM

#11075 RE: doubting #11074

Yes, I think that means the same thing. The estimated cost for the EPC (Engineering, Procurement and Construction) report, which is necessary prior to getting bonds sold. Although the term "estimate" in my mind leaves open the possibility that as the report is finally completed there could be extra costs not yet accounted for. Not for sure but just my best guess.