InvestorsHub Logo

kgoodrich

01/28/06 3:09 PM

#18886 RE: SEBASS #18882

Here is a simple guideline Sebass
It is just a little helpmate when trying to discern the movements of the indicators. This first one is more for a short term watch, and the second set is for a more longer term look. Hope they help sebass. I do like to see that MACD crossover, too, as you mentioned.

#1. AROON- 8 You watch as the Aroon down crosses the 75 down and the aroon up comes up from zero. Most important. (\0/)
#2. WILLIAMS%R- 9 You watch the line cross the 50.
#3. ChiOsc- 2, 5 You watch the ChiOsc crossing the zero line.
#4. ADX/DMI-5 You watch as the D+ line either crosses, or is higer then the D-
#5. MACD histogram- 5,15,10 You watch the negative bars register -50% smaller then the bar before it, or -50% smaller then the largest in the grouping.
#6. Full Stoch- 5, 5 You watch the fast line cross the slow line while the aroon down(8) crosses the 87.50. Crossing the 20 would be best, when the williams agrees.
#7. Bollinger Band 20,2 You watch for the Magic Box to occur when the negative close touches above the lower bolly and the next day’s close to it is positive growth in a white candle.


MACD- 8,17,9….You watch the fast line cross the slow line and head towards the mid-zero line.
FAST STOCH- 14,3…You watch the crossover of the %K crosses through the %D and cross the 20.
ROC- 12….You watch the ROC coming from –5 to the zero line
PPO- 5,10,15…You watch as the 5 crosses the 10 and races to the .00
ULT OSC- 7,14,28…You watch as the 30 comes from below and crosses towards the 50.
PMO- You watch for the crossover of the PMO through the 10 day EMA.
ADX/DMI- 14…You watch as the +D line comes from 15 to the 20 and goes up.
AROON- 22…..You watch as the Aroon up goes up and this can only happen when the MACD fast & slow cross their mid-zero level.
WILLIAMS%R- 14…You watch the line cross the 50.
CCI- 8….You watch the line break the 50.
SLOW STOCH- 9,3…You watch the lines break the 50.
RSI- 14…You watch the line cross the 50.

And, you watch the 5 day MA cross the 10 day MA.