InvestorsHub Logo

silver100

10/22/13 11:15 AM

#242 RE: gharma #240

The first section tested was expected to be lower grade and is consitent with what they expected for this portion.

"The tonnage processed and the grade of the gold and silver produced from the material excavated from the 426585E development going through these stopes was estimated to be 1,451 tonnes grading 4.6 grams per tonne gold and 6.8 grams per tonne silver, based on the preliminary mill results estimated for the 426585E Stopes."