InvestorsHub Logo

joboggi

11/18/13 5:49 AM

#87 RE: tykundegex #86

Well, they continue to claim that they have financing for the Arizona project, however, the California people pulled their contract to buy the power, so it will not get built until they sell the power. The same goes for Texas.

Now, Texas is a power grid unto its own. ( We have the East and West power grids and Texas. ) So, that is an interesting story in its own right, but it also means that Texas is more likely to get built.

However, nothing is getting built right now. Site preparation is not the same putting $750 million into a generator.