JBI Chief of Technology John Bordynuik stated, "Processor number three, as expected, had very mild amounts of coking throughout the pre-melt and the residue removal system has been operating as we had hoped. The resultant mild coking in the pre-melt was expected, due to our flue gas piping needing to be slightly adjusted. The reactor and residue kilns were both in excellent condition during our visual inspection. In addition, the adjustments that were made to the machine's flue gas piping have helped the machine achieve ideal heat profiling, which is precisely what we were striving for during this period of downtime. Our next step for processor number three is to work on maximizing feed rates."