The initial plan for Drexel was three fold.

The first was R&D which was conducted in an 'enclosed' area not view-able from any point in the facility, unless one was inside that area.

The second was to 'extract' carbon nanotubes and then mix batches of Kryron for R&D and small production batches. . .

The third was to utilize the additional floor space at Drexel for up to 2 additional separate production lines for body armor production. A cooling tower had been purchased to accommodate this.

Due to what we now all know about JB, this never came to happen even though B.I. did have orders for Body Armor that could have been produced using the third part of the initial plan. . . INSTEAD it was more economic to use sub-tier contractors to produce the body armor.

Batches of Kryron were mixed at Drexel, sent out to the sub-tier contractor, then brought back to Drexel for final assembly. This was primarily due to Sean's doing and saved the company quite a bit of labor expense, which we now know was a 'difficulty' for B.I.

Sean had a very positive impact on B.I. despite what many think here. During the visits I and others made, he always had prospective customers at Drexel. . . JB seemed to routinely manage to 'blow up' [a term I've heard from other insiders] deals either due to his 'dependencies' or his paranoia. . .