LAST DRILLING RESULT, Al Amir SE-13 Well:
This well reached total drilling depth on November 7 at 10,350 feet. Log analysis indicates 20 feet of Shagar net pay with 12% porosity and low water saturation. The Shagar zone was perforated from 9,895-9,908 feet. Initial testing resulted in an oil rate of 1,280 bbl/d on 26/64” choke. The well began production on November 25 and is currently producing 743 bopd on a 22/64” choke setting.