On May 28, 2008, Adam LeWinter and Director Jeff Orlowski filmed a historic breakup at the Ilulissat Glacier in Western Greenland. The calving event lasted for 75 minutes and the glacier retreated a full mile across a calving face three miles wide. The height of the ice is about 3,000 feet, 300-400 feet above water and the rest below water.

Chasing Ice won the award for Excellence in Cinematography at the 2012 Sundance Film Festival, and has won 24 awards so far this year. Playing in theaters now.

http://www.youtube.com/watch?v=hC3VTgIPoGU [different, shorter version, minus the last segment at http://www.guardian.co.uk/environment/video/2012/dec/12/chasing-ice-iceberg-greenland-video and https://www.youtube.com/watch?v=coq_hGVsZqE , and embedded at http://www.huffingtonpost.com/2012/12/12/ilulissat-glacier-break-calve-video_n_2287987.html (with comments)]


--


Ilulissat Icefjord (UNESCO/TBS
Published on Aug 22, 2012

Located on the west coast of Greenland, 250 km north of the Arctic Circle, Greenland’s Ilulissat Icefjord (40,240 ha) is the sea mouth of Sermeq Kujalleq, one of the few glaciers through which the Greenland ice cap reaches the sea. Sermeq Kujalleq is one of the fastest (19 m per day) and most active glaciers in the world. It annually calves over 35 km3 of ice, i.e. 10% of the production of all Greenland calf ice and more than any other glacier outside Antarctica. Studied for over 250 years, it has helped to develop our understanding of climate change and icecap glaciology. The combination of a huge ice-sheet and the dramatic sounds of a fast-moving glacial ice-stream calving into a fjord covered by icebergs makes for a dramatic and awe-inspiring natural phenomenon.

Source: UNESCO TV / © TBS
Produced by TBS
Supported by Sony
URL: http://whc.unesco.org/en/list/1149/

http://www.youtube.com/watch?v=Tp2EVJ57TAE


--


(linked in) http://investorshub.advfn.com/boards/read_msg.aspx?message_id=81646654 and following


F6

01/03/13 9:01 PM

#196235 RE: F6 #195096

Yellowstone River Oil Spill: Delayed Response From Exxon Made Matters Worse, Feds Say


This July 11, 2011 file photo shows an oil spill crew worker for Oil Mop Emergency Response stepping out of a ring of absorbent pads along a flood plain of the Yellowstone River where oil was found collected, near Laurel, Mont.
(AP Photo/Julie Jacobson, File)


By MATTHEW BROWN
01/02/13 07:00 PM ET EST

BILLINGS, Mont. — Delays in Exxon Mobil Corp.'s response to a major pipeline break beneath Montana's Yellowstone River made an oil spill far worse than it otherwise would have been, federal regulators said in a new report.

The July 2011 rupture fouled 70 miles of riverbank along the scenic Yellowstone, killing fish and wildlife and prompting a massive, months-long cleanup.

The damage could have been significantly reduced if pipeline controllers had acted more quickly, according to Department of Transportation investigators.

The report, provided to The Associated Press by the office of Montana U.S. Sen. Max Baucus, marks the first time federal regulators have highlighted specific actions by Exxon as contributing to the severity of the spill.

An Exxon spokeswoman said Wednesday the company was reviewing the findings.

The spill released about 63,000 gallons of crude from Exxon's 20-year-old Silvertip pipeline into the river near the city of Laurel. That damage would have been reduced by about two-thirds if controllers in Houston isolated the rupture as soon as problems emerged, investigators said.

Instead, after Exxon personnel partially shut down the line and were weighing their next steps, crude drained from the severed, 12-inch pipeline for another 46 minutes before a key control valve was finally closed.

Exxon spent $135 million on its response to the spill, including cleanup and repair work.

Spokeswoman Rachael Moore said the company will continue to cooperate with Pipeline and Hazardous Materials Safety Administration and "is committed to learning from these events."

The report chalks up the immediate cause of the spill to floodwaters that damaged the pipeline and left it exposed. Debris washing downriver piled up on the line, increasing pressure until it ruptured.

The "volume would have been much less" and the location of spill "would have been identified far more quickly" if Exxon's emergency procedures had called for the immediate closure of upstream valves, investigators said.

The report also faulted Exxon for lacking a plan to notify pipeline controllers that the river was flooding.

Exxon workers were not blamed, however, for steps taken in the lead-up to the spill.

Exxon's field observations and "depth of cover survey took reasonable precautions to address the flooding of the Yellowstone River it the spring and early summer of 2011," the investigators wrote.

City officials in Laurel had warned Exxon that the riverbank was eroding. The company, however, continued to run crude beneath the Yellowstone after finding that a section of pipeline leading away from the river was still buried more than 6 feet deep.

The report did not address concerns raised by Baucus, a Democrat, and other lawmakers over whether existing pipeline regulations do enough to prevent spills at river crossings.

Under current rules, companies must bury pipelines 4 feet beneath a riverbed and inspect them periodically.

Those rules are being reviewed, and Baucus said Wednesday that "transparency and oversight are critical to making sure we never have to go through the devastation of the Yellowstone River oil spill again."

Landowners along the river have sued Exxon, saying the company didn't do enough to prevent the spill and should have shut down the line during flooding. Exxon is fighting the lawsuits.

An attorney for plaintiffs in one of the cases, Jory Ruggiero, said Wednesday that Exxon at a minimum should have been on high alert when the pipeline broke and ready to shut it down instantly.

But federal officials also bear some responsibility, said Carl Weimer with the Pipeline Safety Trust, an advocacy group. He said government officials were in a position to review the company's accident response plans prior to the accident and make sure those were sufficient.

The federal investigation into the spill remains open. Whether any citations will be issued is under review, said spokesman Damon Hill with the Department of Transportation's Pipeline and Hazardous Materials Safety Administration.

No timetable was available for any such decision, Hill added.

Copyright 2012 The Associated Press

http://www.huffingtonpost.com/2013/01/02/yellowstone-river-oil-spill-response_n_2397209.html [with comments]

---

(linked in):

http://investorshub.advfn.com/boards/read_msg.aspx?message_id=64863296 and preceding (and any future following)

http://investorshub.advfn.com/boards/read_msg.aspx?message_id=72412869 and preceding and following