He has done nothing per the City of Palm Coast Permitting Dept. on that store since 8-9-12 ...he failed 2 inspections ..so if the wireless backhaul network with 7 wireless sites is being installed and ready to go soon (announced in August 27 PR) how can you run the supposed network if your not even allowed to open the front door and legally inhabit the space it exists in ?
So really I dont even need to drive up there to see - city permitting shows the "corporate retail location" cannot be opened. So there is traceable third party proof.
From the permitting dept : last entry on the space
"08/09/2012 - THIS IS A REINSPECTION Inspection Resulted at 8/9/2012 3:01:33 PM NEED TO PULL A PERMIT TO SHOW ANY WALLS OR COUNTER SPACE BEING ADDED BEFORE OCCUPANCY CAN BE FINALED"
[/b
The Company has recently completed a fiber backhaul installation at the corporate retail location in Palm Coast and will be installing new revolutionary advanced technology broadband equipment for testing.