Seriously, I think their odds are better at the Gold Star/Gold Crown at producing gold someday. I doubt there is even a hundredth of the amount of gold they are stating in their "technical" report, but a small operation might result in a few hundred ounces if they stick to the stream channel, can make it through the permitting, and if they run enough gravel.
Why take on a several-year-long permitting process at a hardrock mine? It will drain their finances - engineers, geologists, labs, monitoring well drilling costs, etc. - it all adds up.